Permit Details

Status:
Complete
Type:
Development Package
Address:
3050 N ORACLE RD
Apply Date:
12/12/2016
Applicant:
burak bekat
Description:
SITE

Permit Reviews

Permit Number - DP16-0228
Permit Status: Complete
Permit Description: SITE
Start Date Submittal Complete Date Status  
12/12/2016 SITE and/or GRADING 12/14/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0228
Permit Description: SITE
Total Completed Inspections - 10
Date Description Inspector Results Comments
12/28/2016 SITE - Stormwater Follow-up Passed {Activity date: 12/28/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - LESS THAN 1 ACRE DISTURBED, NO SWPPP REQUIRED}
12/28/2016 SITE - Stormwater Final Inspection Passed {Activity date: 12/28/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - LESS THAN 1 ACRE DISTURBED, NO SWPPP REQUIRED}
12/28/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 12/28/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - LESS THAN 1 ACRE DISTURBED, NO SWPPP REQUIRED}
12/28/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 12/28/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO PRE-CON CALLED IN, WORK IS ABOUT 25% COMPLETE}
02/17/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 02/17/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
02/17/2017 ENGR Grading Final Passed {Activity date: 02/17/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 12/30/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) REVIEWED PLANS AND ADA ACCESS W/ SUPERINTENDENT
2) BUILD THE SITE PER THE APPROVED PLANS OR PROVIDE AN APPROVED PLAN THAT SHOWS ME WHAT WAS CONSTRUCTED} ; {Activity date: 12/28/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONSTRUCT THE SITE PER THE APPROVED PLANS, CALL FOR INSPECTION}
02/17/2017 COT - ENGR - Signage Final Passed {Activity date: 02/17/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
06/02/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 06/02/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/18/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - TO BE INSPECTED ON 5/19/17 WITH THE APPROVED PLANS} ; {Activity date: 02/17/2017; Status: Not ready for Inspection; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
06/02/2017 ENGR Engineering Final Passed {Activity date: 06/02/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 05/19/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET THE CONTRACTOR AND DANNY FROM THE CITY OF TUCSON TRANSPORTATION TO LOOK OVER THE DRIVEWAY APRONS AND SIDEWALKS ON THE NORTHSIDE ENTRANCE. WE THEN LOOKED AT THE ENTRANCE OFF OF ORACLE AND HAVE DETERMINED THAT DANNY WILL CHECK WITH THEIR EOR AND MAKE A DETERMINATION HOW THAT ONE WILL BE POURED. THE NORTHERN DRIVEWAY WILL BE POURED ON MONDAY OR TUESDAY OF NEXT WEEK.} ; {Activity date: 05/18/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS, THIS WILL INCLUDE THE NEW WHEEL CHAIR ACCESS RAMP INTO THE RIGHT OF WAY AT THE NORTHWEST CORNER OF THIS SITE.} ; {Activity date: 12/28/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE THE BLDG PERMIT HAS BEEN APPROVED}
07/02/2017 RSBU - Building Final Passed {Activity date: 07/02/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_A1.0 OF 1.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW