Permit: DP16-0203
Permit Details
Apply Date:
11/15/2016
Applicant:
Lisa Bowers
Description:
SITE/GRADING - COMMUNITY FOOD BANK - CARIDAD KITCHEN EXPANSIONOriginal Approval 2/9/2017 (11 pag
Permit Reviews
Permit Number - DP16-0203
Permit Status: Complete
Permit Description: SITE/GRADING - COMMUNITY FOOD BANK - CARIDAD KITCHEN EXPANSIONOriginal Approval 2/9/2017 (11 pag
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/08/2017 | DEV PKG - RESUBMITTAL | 02/14/2017 | COMPLETED |
08/03/2017 | DEV PKG - REVISION | 08/04/2017 | COMPLETED |
11/15/2016 | DEV PKG - OK TO SUBMIT | 11/15/2016 | COMPLETED |
11/15/2016 | DEV PKG | 12/27/2016 | COMPLETED |
12/27/2016 | DEV PKG - RESUBMITTAL | 02/08/2017 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP16-0203
Permit Description: SITE/GRADING - COMMUNITY FOOD BANK - CARIDAD KITCHEN EXPANSIONOriginal Approval 2/9/2017 (11 pag
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/16/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 02/16/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE A CERT STATEMENT AT FINAL PER APPROVED PLANS 2) CALL FOR FOLLOW UP INSPECTION FOR ANY SITE, GRADING, AND LANDSCAPE CONCERNS} |
|
08/01/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 08/01/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
08/01/2017 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 08/01/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
08/01/2017 | SITE - Stormwater Follow-up | Passed | {Activity date: 08/01/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/10/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/28/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} | |
08/01/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 08/01/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - FILE A NOTICE OF TERMINATION WITH ADEQ} | |
08/01/2017 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 08/01/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
08/01/2017 | COT - ENGR - Signage Final | Passed | {Activity date: 08/01/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
08/07/2017 | ENGR Engineering Final | Passed | {Activity date: 08/07/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/01/2017; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE AN APPROVED REVISED PLAN SHOWING CHANGES MADE TO ROOF DRAINAGE, DIRECTION OF FLOW, SCUPPER INSTALLATION, AND DOWNSPOUT INSTALL. 2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD 3) CALL FOR RE-INSPECTION } |
|
08/07/2017 | ENGR Grading Final | Passed | {Activity date: 08/07/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/01/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE AN APPROVED REVISED PLAN SHOWING CHANGES MADE TO ROOF DRAINAGE, DIRECTION OF FLOW, SCUPPER INSTALLATION, AND DOWNSPOUT INSTALL. 2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD 3) CALL FOR RE-INSPECTION CALL FOR RE-INSPECTION} |