Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/01/2017 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 08/01/2017 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 08/01/2017 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 04/10/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) RE-BAR LAY OUT FOR THE TRASH ENCLOSURE PAD AND APRON INSTALLED PER PLAN.
2) MASONRY SITE RETAINING WALL FOOTING DIMENSIONS AND RE-BAR LAY OUT PER APPROVED PLANS |
| 03/09/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - TRASH ENCLOSURE FOOTINGS AND RE-BAR LAY OUT PER APPROVED PLANS - OK TO POUR CONCRETE |
| 08/07/2017 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 08/01/2017 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) PROVIDE AN APPROVED REVISED PLAN SHOWING CHANGES MADE TO ROOF DRAINAGE, DIRECTION OF FLOW, SCUPPER INSTALLATION, AND DOWNSPOUT INSTALL.
2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD
3) CALL FOR RE-INSPECTION
CALL FOR RE-INSPECTION |