Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP16-0203
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/01/2017 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
08/01/2017 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
08/01/2017 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
04/10/2017 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) RE-BAR LAY OUT FOR THE TRASH ENCLOSURE PAD AND APRON INSTALLED PER PLAN. 2) MASONRY SITE RETAINING WALL FOOTING DIMENSIONS AND RE-BAR LAY OUT PER APPROVED PLANS |
03/09/2017 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - TRASH ENCLOSURE FOOTINGS AND RE-BAR LAY OUT PER APPROVED PLANS - OK TO POUR CONCRETE |
08/07/2017 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
08/01/2017 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) PROVIDE AN APPROVED REVISED PLAN SHOWING CHANGES MADE TO ROOF DRAINAGE, DIRECTION OF FLOW, SCUPPER INSTALLATION, AND DOWNSPOUT INSTALL. 2) PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD 3) CALL FOR RE-INSPECTION CALL FOR RE-INSPECTION |