Permit: DP16-0185
Permit Details
Apply Date:
10/25/2016
Applicant:
Garett Cunningham
Description:
SITE/GRADING- Frog & Firkin
Permit Reviews
Permit Number - DP16-0185
Permit Status: Complete
Permit Description: SITE/GRADING- Frog & Firkin
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/19/2017 | DEV PKG - RESUBMITTAL | 05/23/2017 | COMPLETED |
05/22/2017 | DEV PKG - RESUBMITTAL | 05/23/2017 | COMPLETED |
10/25/2016 | DEV PKG - OK TO SUBMIT | 10/25/2016 | COMPLETED |
10/25/2016 | DEV PKG | 04/19/2017 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP16-0185
Permit Description: SITE/GRADING- Frog & Firkin
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/07/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 06/07/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) LIMITED SITE WORK AND LIMITED SITE PLAN. 2) SITE IS LESS THAN 1 ACRE THEREFORE NO SWPPP IS REQUIRED. 3) INSPECTIONS WILL BE DONE PER THE APPROVED PLAN. 4) CALL FOR INSPECTION FOR TRASH ENCLOSURE FOOTINGS AND RE-BAR LAYOUT. 5) CALL FOR INSPECTIONS FOR ANY SITE CONCERNS} |
|
08/01/2018 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 08/01/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
08/01/2018 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 08/01/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
08/01/2018 | SITE - Stormwater Follow-up | Passed | {Activity date: 08/01/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
08/01/2018 | SITE - Stormwater Final Inspection | Passed | {Activity date: 08/01/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
08/01/2018 | COT - ENGR - Signage Final | Passed | {Activity date: 08/01/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
08/21/2018 | ENGR Grading Final | Passed | {Activity date: 08/21/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/13/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - OK FOR THE POURING OF THE HANDICAP PARKING SPACE AND ACCESS AISLE, TO BE INSPECTED AT A LATER DATE } ; {Activity date: 08/10/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH THE CONTRACTOR ON SITE TO LOOK AT PROPOSED MODIFICATIONS BY THE CONTRACTOR, HAVE ASKED FOR APPROVED REVISED DRAWINGS FOR ALL CHANGES MADE TO THIS SITE PRIOR TO THE FINAL.} ; {Activity date: 08/09/2018; Status: Partial Approval; Inspector: DQUINN1; Comment: Entered by DQUINN1 - IVRS - Inspection :*} ; {Activity date: 08/07/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SLAB FOR THE TRASH ENCLOSURE IS POURED, THEY WILL BE WORKING ON THE INSTALLATION OF THE DOORS} |
|
09/27/2018 | ENGR Engineering Final | Passed | {Activity date: 09/27/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/21/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE CREWS HAVE COMPLETED THE CONCRETE PLACEMENT FOR THE HANDICAP PARKING AND ACCESS AISLE, THEY STILL NEED TO INSTALL THE PARKINHG SIGN FOR THIS SPACE. COMPLETE ALL OF THE REMAINING ITEMS ON THIS SITE PRIOR TO CALLING IN FOR THE FINAL INSPECTION OF THIS DP.} |