Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP16-0185
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/01/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
08/01/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
08/01/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
07/13/2018 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by DROBERT5 - THE CONTRACTOR HAS EXCAVATED FOR THE TRASH ENCLOSURE AND IS IN THE PROCESS OF INSTALLING THE REBAR PER THE APPROVED PLANS. I HAVE PASSED THIS INSPECTION SO THAT THEY CAN POUR THE FOOTER EARLY NEXT WEEK. THEY WILL SCHEDULE THE WALL AGAIN WHEN THEY ARE READY TO GROUT THE WALLS. |
08/21/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
08/13/2018 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by DROBERT5 - OK FOR THE POURING OF THE HANDICAP PARKING SPACE AND ACCESS AISLE, TO BE INSPECTED AT A LATER DATE |
08/10/2018 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by DROBERT5 - MET WITH THE CONTRACTOR ON SITE TO LOOK AT PROPOSED MODIFICATIONS BY THE CONTRACTOR, HAVE ASKED FOR APPROVED REVISED DRAWINGS FOR ALL CHANGES MADE TO THIS SITE PRIOR TO THE FINAL. |
08/09/2018 | ENGR Grading Final | DQUINN1 | Partial Approval | Entered by DQUINN1 - IVRS - Inspection :* |
08/07/2018 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by DROBERT5 - SLAB FOR THE TRASH ENCLOSURE IS POURED, THEY WILL BE WORKING ON THE INSTALLATION OF THE DOORS |