Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
10/21/2016
Applicant:
Lisa Bowers
Description:
SITE

Permit Reviews

Permit Number - DP16-0183
Permit Status: Complete
Permit Description: SITE
Start Date Submittal Complete Date Status  
10/21/2016 DEV PKG - OK TO SUBMIT 10/21/2016 COMPLETED Review Details
10/21/2016 SITE and/or GRADING 12/22/2016 COMPLETED Review Details
12/22/2016 SITE and/or GRADING 12/29/2016 ACTIVE Review Details
12/22/2016 SITE and/or GRADING 12/22/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0183
Permit Description: SITE
Total Completed Inspections - 9
Date Description Inspector Results Comments
04/05/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/05/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ON SITE.}
05/08/2017 SITE - Stormwater Follow-up Passed {Activity date: 05/08/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 04/26/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - NO CONCERNS.} ; {Activity date: 04/18/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS ON THIS SITE AT THIS TIME. CURRENTLY THERE IS NO TRACKOUT MATERIAL IN PLACE, BUT THE CONTRACTOR IS MAKING SURE TO KEEP ALL MATERIAL ON THE SITE. DIRT BERMS ARE BEING UTILIZED ALONG THE EAST SIDE OF THE PROPERTY IN THE ADJACENT TO THE DRAINAGE CHANNEL.}
05/08/2017 SITE - Stormwater Final Inspection Passed {Activity date: 05/08/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
05/08/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 05/08/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
06/30/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 06/30/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
06/30/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 06/30/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
06/30/2017 ENGR Grading Final Passed {Activity date: 06/30/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
06/30/2017 COT - ENGR - Signage Final Passed {Activity date: 06/30/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
07/05/2017 ENGR Engineering Final Passed {Activity date: 07/05/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 06/30/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET TIE-IN AT ROOF DRAIN. BIKE PARKING. RIP-RAP. STAKING TREES.}

Documents

File Name Document Type  
001_COVER SHEET_1 OF 9.TIF DEVELOPMENT PACKAGE VIEW
002_NOTES_2 OF 9.TIF DEVELOPMENT PACKAGE VIEW
003_SITE_3 OF 9.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING / DRAINAGE_4 OF 9.TIF DEVELOPMENT PACKAGE VIEW
005_UTILITIES / EASEMENTS_5 OF 9.TIF DEVELOPMENT PACKAGE VIEW
006_DETAILS_6 OF 9.TIF DEVELOPMENT PACKAGE VIEW
007_LANDSCAPE_7 OF 9.TIF DEVELOPMENT PACKAGE VIEW
008_IRRIGATION_8 OF 9.TIF DEVELOPMENT PACKAGE VIEW
009_LANDSCAPE / IRRIGATION DETAILS_9 OF 9.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW