Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 05/08/2017 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 04/26/2017 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DROBERT5 - NO CONCERNS. |
| 04/18/2017 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by DROBERT5 - NO CONCERNS ON THIS SITE AT THIS TIME. CURRENTLY THERE IS NO TRACKOUT MATERIAL IN PLACE, BUT THE CONTRACTOR IS MAKING SURE TO KEEP ALL MATERIAL ON THE SITE. DIRT BERMS ARE BEING UTILIZED ALONG THE EAST SIDE OF THE PROPERTY IN THE ADJACENT TO THE DRAINAGE CHANNEL. |