Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
10/19/2016
Applicant:
Description:
GRADING

Permit Reviews

Permit Number - DP16-0179
Permit Status: Complete
Permit Description: GRADING
Start Date Submittal Complete Date Status  
10/19/2016 GRADING 10/19/2016 COMPLETED Review Details
10/19/2016 GRADING 12/13/2016 COMPLETED Review Details
12/13/2016 REVISION - GRADING 01/05/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0179
Permit Description: GRADING
Total Completed Inspections - 9
Date Description Inspector Results Comments
04/06/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/06/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ON SITE . NOT ALL NOTES ON SITE PLAN PAGE IN KEY NOTES.}
04/17/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 04/17/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
04/17/2018 SITE - Stormwater Follow-up Passed {Activity date: 04/17/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
04/17/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 04/17/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
04/17/2018 COT - ENGR - Signage Final Passed {Activity date: 04/17/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 04/06/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
05/09/2018 SITE - Stormwater Final Inspection Passed {Activity date: 05/09/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
05/11/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 05/11/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 05/09/2018; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
05/11/2018 ENGR Engineering Final Passed {Activity date: 05/11/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 05/09/2018; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET STON STABILIZATION ON ALL DISTURED SOIL. COMPLET ALL LANDSCAPING ON AP PLANS. COMPPLET ALL WORK ON SITE PLAN FOR FINAL.}
05/11/2018 ENGR Grading Final Passed {Activity date: 05/11/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }

Documents

File Name Document Type  
001_COVER SHEET_CV.TIF DEVELOPMENT PACKAGE VIEW
002_SITE_SD.TIF DEVELOPMENT PACKAGE VIEW
003_GENERAL NOTES_GN.TIF DEVELOPMENT PACKAGE VIEW
004_FOUNDATION_1.TIF DEVELOPMENT PACKAGE VIEW
005_FLOOR_2.TIF DEVELOPMENT PACKAGE VIEW
006_SHEAR WALL_2.1.TIF DEVELOPMENT PACKAGE VIEW
007_ELEVATIONS_3.TIF DEVELOPMENT PACKAGE VIEW
008_FRAMING_4.TIF DEVELOPMENT PACKAGE VIEW
009_DETAILS_5.TIF DEVELOPMENT PACKAGE VIEW
010_SECTIONS_6.TIF DEVELOPMENT PACKAGE VIEW
011_ELECTRICAL_7.TIF DEVELOPMENT PACKAGE VIEW
012_PLUMBING_8.TIF DEVELOPMENT PACKAGE VIEW
013_MECHANICAL_9.TIF DEVELOPMENT PACKAGE VIEW