Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Development Package
Address:
5020 E GLENN ST
Apply Date:
09/30/2016
Applicant:
Description:
SITE/GRADING/SWPPP - SKILLED NURSING FACILITYOriginally approved 12/13/2016 (31 pages)

Permit Reviews

Permit Number - DP16-0172
Permit Status: Issued
Permit Description: SITE/GRADING/SWPPP - SKILLED NURSING FACILITYOriginally approved 12/13/2016 (31 pages)
Start Date Submittal Complete Date Status  
03/06/2019 DEV PKG - REVISION 04/12/2019 COMPLETED Review Details
09/30/2016 DEV PKG - OK TO SUBMIT 10/04/2016 COMPLETED Review Details
10/04/2016 DEV PKG 11/17/2016 COMPLETED Review Details
11/18/2016 DEV PKG 12/15/2016 COMPLETED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP16-0172
Permite Description: SITE/GRADING/SWPPP - SKILLED NURSING FACILITYOriginally approved 12/13/2016 (31 pages)
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
01/11/2018 SITE - Stormwater Final Inspection N/A Complete (Recurring) {Activity date: 01/11/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - LOOKED AT NEW WALKING PATH ON EAST SIDE OF PARKING LOT EAST OF SITE. CHECKED HAND RAILING AND PATH.}
04/18/2018 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 04/18/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 02/07/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE VISIT ONLY, NO CONCERNS AT THIS TIME, COMPLETE ALL PREVIOUSLY DISCUSSED ITEMS PRIOR TO CALLING IN FOR ANOTHER INSPECTION
} ; {Activity date: 01/16/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, THE CONTRACTOR IS HAULING OFF EXCESS MATERIAL FROM THS SITE AS NEEDED. THEY HAVE BEEN ADVISED TO ENSURE THAT THE TRACKOUT MATERIAL IS CLEANED UP IF ANYTHING HITS THE STREETS.} ; {Activity date: 08/17/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THISA TIME.} ; {Activity date: 07/19/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS ON THIS SITE AT THIS TIME, THE STORMWATER CONTROLS ARE WORKING AS DESIGNED, NO TRACK OUT NOTED ON THE STREETS.} ; {Activity date: 06/28/2017; Status: Not ready for Inspection; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - PROVIDE COT AP PLANS ON SITE.} ; {Activity date: 06/28/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - INSTALLING HDPE 24'' PER PLANS ON SITE NOT COT AP PLANS. PROVIDE COT AP PLANS FOR INSPECTIONS.} ; {Activity date: 04/14/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 04/11/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 04/04/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 03/21/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - METWITH GC ABOUT ADDING SWPPP INFO AT GATE.}
10/27/2022 PDSD Site/Engineering Division - Landscaping N/A Not Ready
10/27/2022 COT - ENGR - Signage Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: DP16-0172
Permit Description: SITE/GRADING/SWPPP - SKILLED NURSING FACILITYOriginally approved 12/13/2016 (31 pages)
Total Completed Inspections - 6
Date Description Inspector Results Comments
01/16/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 01/16/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/16/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 01/16/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/16/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO ONE ON SITE . COMPLET NOTES FROM LAST INSPECTION.} ; {Activity date: 02/10/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH KITCHELL AND ADVISED THEM OF THE FOLLOWING: 1) THEIR STORMWATER CONTROLS ARE NOT IN PER THE APPROVED DIAGRAHMS AND PLANS. THEY WILL NEED TO MAKE SURE THAT THE WADDLE IS PLACED IN A DEPRESSED AREA AND STAKED NO MORE THAT 4 FEET ON CENTER IN ALL THE AREAS THAT ARE REQUIRED AND WILL ALLOW RUNOFF ONTO THE ADJACENT PROPERTIES.2) ADIVSED THEM TO MAKE SURE THAT THE NOI WAS POSTED AS REQUIRED AT THE ENTRANCE INTO THE SITE AND TO ENSURE THAT ALL TRACK OUT IS MAINTAINED ON A DAILY BASIS. 3) CALL IN FOR THE PRE-CONSTRUC TION MEETING THAT SHOULD HAVE BEEN DONE BEFORE ANY OF THE WORK STARTED ON THIS SITE. 4) ALSO THEY WILL NEED TO SCHEDULE STORMWATER INSPECTIONS NO LESS THAN EVERY 2 WEEKS, AND AFTER EVERY MAJORE RAIN EVENTTO ENSURE THAT THERE ARE NO CONCERNS WITH THIS SITE.

THEY HAVE ADVISED ME THAT THERE IS NO UNGROUND PIPING FOR THE STORMWATER, BUT IF ANYTHING CHANGES THE PIPING AND INSTALLATION NEEDS TO BE INSPECTED BY THE INSPECTOR PRIOR TO COVERING AND BACKFILLING. AT THE END OF THE SITE A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD WILL BE REQUIRED ALONG WITH APPROVED REVISIONS FOR ALL CHANGES THAT HAVE BEEN MADE TO THE SITE.

IF THERE ARE ANY CONCERNS YOU CAN CONTACT DAVID ROBERTS AT 520-349-7643 FOR RON LE DONNE AT 520-909-5151 TO ARRANGE FOR AN ONSITE MEETING OR CLARIFICATION OF ANY CONCERNS.}
01/16/2018 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/16/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/16/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE ITEMS AS PREVIOUSLY NOTED FOR THE STORMWATER. THE CONTRACTOR IS USING A BIOSOCK WHICH IS NOT WHAT HAS BEEN APPROVED FOR THIS SITE BY THE ENGINEER OF RECORD. I HAVE ASKED THE CONTRACTOR TO PROVIDE US WITH THE CUT SHEETS FROM THE OWNER OF THE MATERIAL.} ; {Activity date: 02/22/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET ON THE SITE AND LOOKED AT THE WADDLE THAT HAS BEEN PLACED ON THIS SITE. NON OF IT HAS BEEN STAKED AT THIS TIME AND STILL NEEDS TO BE REPAIRED. THE DEVELOPER HAS ADVISED ME THAT HE IS USING A DIFFERENT TYPE OF MATERIAL THAN WHAT IS SHOWN ON THE APPROVED PLANS. I ASKED THAT HE ASK THE ENGINEER OF RECORD TO SEND ME AN APPROVAL LETTER FROM THE EOR THE HE IS ACCEPTING THE CHANGE OF MATERIAL AND COPIES OF THE MANUFACTURERS SPECIFICATIONS AND INSTALLATION DOCUMENTS SO THAT WE CAN PLACE THIS IN OUR FILES FOR FUTURE REFERENCE.
HE WILL SCHEDULE ANOTHER INSPECTION FOR THIS SITE WHEN HE HAS ALL OF THE DOCUMENTATION THAT HAS BEEN REQUESTED SO THAT RON CAN COMPLETE THE CONSTRUCTION PRE-CON MEETING FOR THE SITE.}
11/02/2023 PDSD Site/Engineering Division - Landscaping Passed
11/02/2023 ENGR Engineering Final Passed
11/02/2023 COT - ENGR - Signage Final Passed

Documents

File Name Document Type  
001_COVER SHEET_C0.1.TIF DEVELOPMENT PACKAGE VIEW
002_GENERAL NOTES_C0.2.TIF DEVELOPMENT PACKAGE VIEW
003_GENERAL NOTES_C0.3.TIF DEVELOPMENT PACKAGE VIEW
004_PAD SITE DATA_C0.4.TIF DEVELOPMENT PACKAGE VIEW
005_PARKING KEY MAP_C0.5.TIF DEVELOPMENT PACKAGE VIEW
006_SITE_C1.1.TIF DEVELOPMENT PACKAGE VIEW
007_SITE_C1.2.TIF DEVELOPMENT PACKAGE VIEW
008_GRADING / PAVING_C2.1.TIF DEVELOPMENT PACKAGE VIEW
009_GRADING / PAVING_C2.2.TIF DEVELOPMENT PACKAGE VIEW
010_HORIZONTAL CONTROL_C3.1.TIF DEVELOPMENT PACKAGE VIEW
011_HORIZONTAL CONTROL_C3.2.TIF DEVELOPMENT PACKAGE VIEW
012_HORIZONTAL CONTROL_C3.3.TIF DEVELOPMENT PACKAGE VIEW
013_SIGNING / STRIPING_C4.1.TIF DEVELOPMENT PACKAGE VIEW
014_SIGNING / STRIPING_C4.2.TIF DEVELOPMENT PACKAGE VIEW
015_SECTIONS / DETAILS_C5.1.TIF DEVELOPMENT PACKAGE VIEW
016_SECTIONS / DETAILS_C5.2.TIF DEVELOPMENT PACKAGE VIEW
017_SECTIONS / DETAILS_C5.3.TIF DEVELOPMENT PACKAGE VIEW
018_ARCADIA TRAIL_C6.1.TIF DEVELOPMENT PACKAGE VIEW
018A_GRADING PAVING_C6.2.PDF DEVELOPMENT PACKAGE VIEW
019_NOTES / SCHEDULES_L1.0.TIF DEVELOPMENT PACKAGE VIEW
020_NPPP_L1.1.TIF DEVELOPMENT PACKAGE VIEW
021_NPPP_L1.2.TIF DEVELOPMENT PACKAGE VIEW
022_LANDSCAPE_L2.1.TIF DEVELOPMENT PACKAGE VIEW
023_LANDSCAPE__L2.2.TIF DEVELOPMENT PACKAGE VIEW
024_LANDSCAPE_L2.3.TIF DEVELOPMENT PACKAGE VIEW
025_ARCADIA TRAIL LANDSCAPE_L2.4.TIF DEVELOPMENT PACKAGE VIEW
026_IRRIGATION_L3.1.TIF DEVELOPMENT PACKAGE VIEW
027_IRRIGATION_L3.2.TIF DEVELOPMENT PACKAGE VIEW
028_LANDSCAPE DETAILS_L4.1.TIF DEVELOPMENT PACKAGE VIEW
029_LANDSCAPE / IRRIGAION DETAILS_L4.2.TIF DEVELOPMENT PACKAGE VIEW
030_IRRIGATION DETAILS_L4.3.TIF DEVELOPMENT PACKAGE VIEW
031_IRRIGATION DETAILS_L4.4.TIF DEVELOPMENT PACKAGE VIEW
000_ROOF DRAINAGE.PDF DEVELOPMENT PACKAGE VIEW
E-MAIL DP160172.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
REVISION LETTER.PDF DOCUMENTS VIEW