Permit: DP16-0172

Parcel: 110121020


Addresses:

5020 E GLENN ST


Inspection Status: Complete (Recurring)

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP16-0172

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Complete (Recurring)

Date Description Inspector Results Comments
04/18/2018 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS.
02/07/2018 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - SITE VISIT ONLY, NO CONCERNS AT THIS TIME, COMPLETE ALL PREVIOUSLY DISCUSSED ITEMS PRIOR TO CALLING IN FOR ANOTHER INSPECTION
01/16/2018 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME, THE CONTRACTOR IS HAULING OFF EXCESS MATERIAL FROM THS SITE AS NEEDED. THEY HAVE BEEN ADVISED TO ENSURE THAT THE TRACKOUT MATERIAL IS CLEANED UP IF ANYTHING HITS THE STREETS.
08/17/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THISA TIME.
07/19/2017 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS ON THIS SITE AT THIS TIME, THE STORMWATER CONTROLS ARE WORKING AS DESIGNED, NO TRACK OUT NOTED ON THE STREETS.
06/28/2017 SITE - Stormwater Follow-up RLEDONN1 Not ready for Inspection Entered by RLEDONN1 - PROVIDE COT AP PLANS ON SITE.
06/28/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - INSTALLING HDPE 24'' PER PLANS ON SITE NOT COT AP PLANS. PROVIDE COT AP PLANS FOR INSPECTIONS.
04/14/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 -
04/11/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
04/04/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 -
03/21/2017 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - METWITH GC ABOUT ADDING SWPPP INFO AT GATE.