Permit: DP16-0134
Permit Details
Status:
Expired
Type:
Development Package
Address:
2355 S AVENIDA LOS REYES
Address NEW:
2355 S AVENIDA LOS REYES
Apply Date:
08/10/2016
Applicant:
Description:
PRIVATE PAVING FOR SUBDIVISION
Outstanding Inspections
Permit Status: Expired
Permit Number: DP16-0134
Permite Description: PRIVATE PAVING FOR SUBDIVISION
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/14/2016 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | {Activity date: 12/14/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WATILES HAVE BEEN INSTALLED . PROVIDE TRACK OUT ROCK AND NOI / SWPPPINFO AT GATE.} |
| 10/06/2017 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 10/06/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - DROVE THROUGH THE SITE TO SEE HOW EVERYTHING IS GOING. THERE IS MINIMAL MATERIAL ON THE STREETS THAT NEED TO BE CLEANED UP AT THIS TIME. NO OTHER CONCERNS} ; {Activity date: 04/11/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT TTIME.} ; {Activity date: 01/24/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GRADING CONTRACTOR ABOUT ADDING TRACK OUT ROCK.} ; {Activity date: 01/19/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/03/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/20/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO ACTIVITY ON SITE.} ; {Activity date: 12/16/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} |
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
| 10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
| 10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
| 10/27/2022 | ENGR Grading Final | N/A | Not Ready | |
| 10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
| 10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready |
Completed Inspections
Permit Status: Expired
Permit Number: DP16-0134
Permit Description: PRIVATE PAVING FOR SUBDIVISION
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/14/2016 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 12/14/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 12/13/2016; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE NOI AND COMPLET INSTALL OF SWPPP CONTROLS.} | |
| 09/27/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 09/27/2023 | PDSD Site/Engineering Division - NPPO | Passed | ||
| 09/27/2023 | ENGR Engineering Final | Passed | ||
| 09/27/2023 | ENGR Grading Final | Passed | ||
| 09/27/2023 | SITE - Stormwater Final Inspection | Passed | ||
| 09/27/2023 | COT - ENGR - Signage Final | Passed |