Inspection Status: Not Ready
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 03/25/2021 |
ENGR Grading Final |
MHERNANDEZ |
Not Applicable |
Entered by VLEON1 - |
| 11/16/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NOTDP16-0035ES ON |
| 10/18/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO GRADING ACTIVITY ON SITE AT THIS TIME. |
| 10/06/2017 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - THE C ONTRACTOR CONTINUES TO WORK ON HOUSE CONSTRUCTION AT THIS TIME, NO OTHER APPARENT WORK AT THIS TIME. |
| 09/09/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH SUB WORKING ON REPAIRING SIDEWALKS. |
| 08/21/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - HANDRAILS INSTALLED FOR RAMP. |
| 08/09/2017 |
ENGR Grading Final |
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |
| 08/04/2017 |
ENGR Grading Final |
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - PROVIDE HAND RAIL ON BOTH SIDES OF RAMP FROM MODEL PARKING AREA. |
| 08/03/2017 |
ENGR Grading Final |
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - |
| 07/28/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - GC NOT ON SITE. CHECKING TEMP ADA WALKWAY AT TOP LANDING. |
| 07/26/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET ON SITE WITH HOUSEING GC ABOUT ADA PATH FROM PARKING AREA. |
| 07/21/2017 |
ENGR Grading Final |
DROBERTS |
Correction Required |
Entered by DROBERT5 - MET WITH CLAYTON AND DISCUSSED THE SLOPES OF THE SIDEWALK AND THE DRIVEWAY INTO THE MODEL HOME. THE CURRENT CONDITIONS OF THE SITE IS NOT ACCEPTABLE FOR THE MODEL HOME AND THE DEVELOPER WITH HAVE TO COME UP WITH AN ALTERNATE SOLUTION FOR THE ADA ACCESSIBLE PATH FROM THE PARKING LOCATIO0N INTO THE MODEL HOME SITE. I INFORMED THE DEVELOPER OF THE REQUIREMENTS AND THEY WILL WORK ON AN ALTERNATE PATHWAY OR PARKING LOCATION. |
| 07/20/2017 |
ENGR Grading Final |
DROBERTS |
Not ready for Inspection |
Entered by DROBERT5 - MET ON SITE WITH THE DEVELOPER AND LOOKED OVER THE AREAS THAT HE IS LOOKING FOR APPROVAL OF THE SIDEWALK ON THIS SITE. THE ADA PARKING SPACES AND ACCESS AISLE FOR THE MODEL HOME IS LESS THAN THE 2% SLOPES IN ALL DIRECTIONS. THE SIDEWALK FROM THE ADA PARKING AREA TO THE ADJACENT SIDEWALK IS OK FOR CROSS SLOPES BUT THE RUNNING SLOPE IS 6.5% TO 7.5% WHICH WILL REQUIRE THAT A HANDRAIL BE PLACED ON BOTH SIDES OF THE SIDEWALKS. THE DRIVE ENTRANCE INTO THE MODEL HOME IS AT 15% OR GREATER IN AREAS, I WILL CHECK WITH CLAYTON ON THIS TO SEE WHAT IF ANYTHING IS ACCEPTABLE. |
| 06/23/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC FOR HOUSE ON SITE. |
| 04/28/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - WORKING ON GRADING ROAD. |
| 02/06/2017 |
ENGR Grading Final |
RLEDONN1 |
Continued |
Entered by RLEDONN1 - WORKING ON PIPING IN STREET. |
| 12/23/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
| 09/27/2023 |
ENGR Grading Final |
|
Passed |
|
| 09/27/2023 |
ENGR Grading Final |
|
Passed |
|