Permit: DP16-0131
Permit Details
Status:
Complete
Type:
Development Package
Address:
380 N HIGHLAND AV 1
Address NEW:
380 N HIGHLAND AV 1
Apply Date:
08/05/2016
Applicant:
Description:
triplex
Completed Inspections
Permit Status: Complete
Permit Number: DP16-0131
Permit Description: triplex
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/03/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/03/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE THERFORE NO SWPPP IS REQUIRED 2) ENSURE ANY SITE/GRADING CHANGES ARE SHOWN ON AN APPROVED PLAN 3) FINAL GRADING INSPECTION AND ENGINEERING FINAL INSPECTION WILL BE DONE PER THE APPROVED PLANS} |
|
| 08/18/2017 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 08/18/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 08/18/2017 | SITE - Stormwater Follow-up | Passed | {Activity date: 08/18/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 08/18/2017 | ENGR Grading Final | Passed | {Activity date: 08/18/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 08/18/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 08/18/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 08/18/2017 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 08/18/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 08/18/2017 | COT - ENGR - Signage Final | Passed | {Activity date: 08/18/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 11/02/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 11/02/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/18/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE LANDSCAPING AS SHOWN ON THE APPROVED PLANS. REWORK OF SOME OF THE AREAS MAY BE NEEDED TO SOLVE THE DRAINAGE ISSUES ON THE SOUTH SIDE OF THE PROJECT.} | |
| 11/02/2017 | ENGR Engineering Final | Passed | {Activity date: 11/02/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/18/2017; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE FOLLOWING ITEMS HAVE NOT BEEN COMPLETED AT THIS TIME: 1) THE EXISTING SIDEWALK THAT HAS NOT BEEN REMOVED IS NON- COMPLIANT FOR THE CROSSSLOPE, IT EXCEEDS THE MAXIMUM 2%. THIS AREA NEEDS TO BE REMOVED AND REPOURED SO THAT IT MEETS THE MAXIMUM ALLOWABLE SLOPES. 2) THE NEW DRIVEWAY/SIDEWALK WAS POURED THIS MORNING AND IS STILL WET AT THIS TIME. IT WAS FORMED TO MATCH THE EXISTING DRIVEWAY/SIDEWALK TO THE NORTH WHICH IS NONCOMPLIANT. THE CONTRACTOR IS TRYING TO PLACE ADDITIONAL CONCRETE BACK INTO THE DRIVEWAY/SIDEWALK AREA SO THAT THEY CAN MAKE THE 2% CROSSSLOPE. THIS WILL HAVE TO BE RECHECKED ONCE THE WORK HAS BEEN COMPLETED. 3) THE TRASH ENCLOSURE FOR THE SITE HAS NOT BEEN CONSTRUCTED AT THIS TIME, IT WILL BE INSTALLED LATER NEXT WEEK. THE CONTRACTOR DOES HAVE THE TRASH CONTAINERS ON THE SITE AT THIS TIME, THEY ARE LOCATED IN FRONT OF THE APARTMENTS AT THIS TIME. 4) THE DRAINAGE ON THE SITE HAS BEEN MODIFIED FROM THE APPROVED PLAN AND ALLOWS THE WATER TO BE DIRECTED AT THE PROPERTY ALONG THE SOUTH SIDE OF THIS SITE. I HAVE SPOKEN TO ERIN HARRIS THE ENGINEER OF RECORD FOR THIS SITE AND SHE WILL BE WORKING WITH THE CONTRACTOR TO ENSURE THAT THE DRAINAGE DOES NOT GO OFF SITE AND IS DRAINED OUT THROUGH THE PARKING LOT ON THE WEST SIDE OF THE SITE. I HAVE ADVISED THE CONTRACTOR THAT I HAVE DENIED THE SITE DO TO THE ISSUES WITH THE DRIVEWAY ENTRANCE AND THE DRAINAGE. HE WILL BE CONTACTING THE BUILDING OFFICIAL TO SEE IF HE COULD GET THE TCO FOR THE SITE TODAY.} ; {Activity date: 08/03/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE THERFORE NO SWPPP IS REQUIRED 2) ENSURE ANY SITE/GRADING CHANGES ARE SHOWN ON AN APPROVED PLAN 3) FINAL GRADING INSPECTION AND ENGINEERING FINAL INSPECTION WILL BE DONE PER THE APPROVED PLANS} |