Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/02/2017 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 08/18/2017 |
ENGR Engineering Final
|
DROBERTS |
Denied |
Entered by DROBERT5 - THE FOLLOWING ITEMS HAVE NOT BEEN COMPLETED AT THIS TIME:
1) THE EXISTING SIDEWALK THAT HAS NOT BEEN REMOVED IS NON- COMPLIANT FOR THE CROSSSLOPE, IT EXCEEDS THE MAXIMUM 2%. THIS AREA NEEDS TO BE REMOVED AND REPOURED SO THAT IT MEETS THE MAXIMUM ALLOWABLE SLOPES.
2) THE NEW DRIVEWAY/SIDEWALK WAS POURED THIS MORNING AND IS STILL WET AT THIS TIME. IT WAS FORMED TO MATCH THE EXISTING DRIVEWAY/SIDEWALK TO THE NORTH WHICH IS NONCOMPLIANT. THE CONTRACTOR IS TRYING TO PLACE ADDITIONAL CONCRETE BACK INTO THE DRIVEWAY/SIDEWALK AREA SO THAT THEY CAN MAKE THE 2% CROSSSLOPE. THIS WILL HAVE TO BE RECHECKED ONCE THE WORK HAS BEEN COMPLETED.
3) THE TRASH ENCLOSURE FOR THE SITE HAS NOT BEEN CONSTRUCTED AT THIS TIME, IT WILL BE INSTALLED LATER NEXT WEEK. THE CONTRACTOR DOES HAVE THE TRASH CONTAINERS ON THE SITE AT THIS TIME, THEY ARE LOCATED IN FRONT OF THE APARTMENTS AT THIS TIME.
4) THE DRAINAGE ON THE SITE HAS BEEN MODIFIED FROM THE APPROVED PLAN AND ALLOWS THE WATER TO BE DIRECTED AT THE PROPERTY ALONG THE SOUTH SIDE OF THIS SITE. I HAVE SPOKEN TO ERIN HARRIS THE ENGINEER OF RECORD FOR THIS SITE AND SHE WILL BE WORKING WITH THE CONTRACTOR TO ENSURE THAT THE DRAINAGE DOES NOT GO OFF SITE AND IS DRAINED OUT THROUGH THE PARKING LOT ON THE WEST SIDE OF THE SITE.
I HAVE ADVISED THE CONTRACTOR THAT I HAVE DENIED THE SITE DO TO THE ISSUES WITH THE DRIVEWAY ENTRANCE AND THE DRAINAGE. HE WILL BE CONTACTING THE BUILDING OFFICIAL TO SEE IF HE COULD GET THE TCO FOR THE SITE TODAY. |
| 08/03/2017 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE THERFORE NO SWPPP IS REQUIRED
2) ENSURE ANY SITE/GRADING CHANGES ARE SHOWN ON AN APPROVED PLAN
3) FINAL GRADING INSPECTION AND ENGINEERING FINAL INSPECTION WILL BE DONE PER THE APPROVED PLANS |
| 11/02/2017 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 08/18/2017 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by DROBERT5 - PATIAL PENDING ALL WORK NOTED IN THE FINAL GRADING INSPECTION FOR THIS SITE.
THE FOLLOWING ITEMS HAVE NOT BEEN COMPLETED AT THIS TIME:
1) THE EXISTING SIDEWALK THAT HAS NOT BEEN REMOVED IS NON- COMPLIANT FOR THE CROSSSLOPE, IT EXCEEDS THE MAXIMUM 2%. THIS AREA NEEDS TO BE REMOVED AND REPOURED SO THAT IT MEETS THE MAXIMUM ALLOWABLE SLOPES.
2) THE NEW DRIVEWAY/SIDEWALK WAS POURED THIS MORNING AND IS STILL WET AT THIS TIME. IT WAS FORMED TO MATCH THE EXISTING DRIVEWAY/SIDEWALK TO THE NORTH WHICH IS NONCOMPLIANT. THE CONTRACTOR IS TRYING TO PLACE ADDITIONAL CONCRETE BACK INTO THE DRIVEWAY/SIDEWALK AREA SO THAT THEY CAN MAKE THE 2% CROSSSLOPE. THIS WILL HAVE TO BE RECHECKED ONCE THE WORK HAS BEEN COMPLETED.
3) THE TRASH ENCLOSURE FOR THE SITE HAS NOT BEEN CONSTRUCTED AT THIS TIME, IT WILL BE INSTALLED LATER NEXT WEEK. THE CONTRACTOR DOES HAVE THE TRASH CONTAINERS ON THE SITE AT THIS TIME, THEY ARE LOCATED IN FRONT OF THE APARTMENTS AT THIS TIME.
4) THE DRAINAGE ON THE SITE HAS BEEN MODIFIED FROM THE APPROVED PLAN AND ALLOWS THE WATER TO BE DIRECTED AT THE PROPERTY ALONG THE SOUTH SIDE OF THIS SITE. I HAVE SPOKEN TO ERIN HARRIS THE ENGINEER OF RECORD FOR THIS SITE AND SHE WILL BE WORKING WITH THE CONTRACTOR TO ENSURE THAT THE DRAINAGE DOES NOT GO OFF SITE AND IS DRAINED OUT THROUGH THE PARKING LOT ON THE WEST SIDE OF THE SITE.
I HAVE ADVISED THE CONTRACTOR THAT I HAVE DENIED THE SITE DO TO THE ISSUES WITH THE DRIVEWAY ENTRANCE AND THE DRAINAGE. HE WILL BE CONTACTING THE BUILDING OFFICIAL TO SEE IF HE COULD GET THE TCO FOR THE SITE TODAY. |
| 08/03/2017 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - POC: VICTOR 273-5291 JAMIE 360-2100
1) SITE IS LESS THAN 1 ACRE THERFORE NO SWPPP IS REQUIRED
2) ENSURE ANY SITE/GRADING CHANGES ARE SHOWN ON AN APPROVED PLAN
3) FINAL GRADING INSPECTION AND ENGINEERING FINAL INSPECTION WILL BE DONE PER THE APPROVED PLANS |