Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
4646 E 22ND ST
Apply Date:
07/12/2016
Applicant:
David Gary Gerovac
Description:
SITE - REMODEL PARKING AND DISPLAY FOR VEHICLE SALES

Permit Reviews

Permit Number - DP16-0116
Permit Status: Complete
Permit Description: SITE - REMODEL PARKING AND DISPLAY FOR VEHICLE SALES
Start Date Submittal Complete Date Status  
07/12/2016 SITE and/or GRADING 07/14/2016 COMPLETED Review Details
07/14/2016 SITE and/or GRADING 08/19/2016 COMPLETED Review Details
08/19/2016 RESUB - SITE and/or GRADING 09/13/2016 COMPLETED Review Details
09/13/2016 RESUB - SITE and/or GRADING 01/12/2017 COMPLETED Review Details
10/26/2017 REVISION - SITE 10/27/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0116
Permit Description: SITE - REMODEL PARKING AND DISPLAY FOR VEHICLE SALES
Total Completed Inspections - 7
Date Description Inspector Results Comments
02/08/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/08/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MINIMAL SITE WORK, NO SWPPP REQUIRED
2) CALL FOR ANY SITE CJANGES AND/OR CONCERNS
3) ENSURE HC PARKING AND ACCESS MEET ADA REQUIREMENTS}
10/23/2017 SITE - Stormwater Follow-up Passed {Activity date: 10/23/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/17/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 08/14/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTION WAS CALLED IN FOR RE-BAR PLACEMENT IN CONCRETE SIDEWALK. RE-BAR INSTALLED PER APPROVED PLAN - DETAIL B ON PG #4. - OK TO POUR CONCRETE
2) TWO STORM WATER BUBBLER BOXES WERE INSTALLED WITH NO INSPECTION - ENG CERTIFICATION REQUIRED PRIOR TO FINAL APPROVAL.
3) SWEEP UP TRACKING OFF OF PUBLIC ROADWAY}
10/23/2017 ENGR Grading Final Passed {Activity date: 10/23/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/23/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/23/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/23/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 10/23/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
12/13/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 12/13/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/23/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
12/13/2018 ENGR Engineering Final Passed {Activity date: 12/13/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/23/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL OF THE WORK ON THIS SITE AS SHOWN ON THE APPROVED PLANS. PROVIDE THE INSPECTOR WITH THE CERTIFICATION LETTER FROM THE ENGINEER OF RECORD ALONG WITH A SET OF APPROVED AS-BUILT/REVISED DRAWINGS FOR THIS SITE FOR ALL MODIFICATIONS THAT HAVE BEEN MADE.} ; {Activity date: 08/15/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PRIOR TO FINAL GRADING APPROVAL, PROVIDE A CERT STATEMENT FROM THR ENG OF RECORD STATING THAT SITE/GRADING WAS CONSTRUCTED PER THE APPROVED PLAN.
2) CALL FOR INSPECTION PRIOR TO COVERING ANY UNDERGROUND SITE DRAINAGE STRUCTURES - PER APPROVED PLANS
3) RE-BAR FOR CURB/SIDEWALK ALONG THE NORTH/NW SIDE OF BLDG INSTALLED PER PLAN} ; {Activity date: 08/14/2017; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTION WAS CALLED IN FOR RE-BAR PLACEMENT IN CONCRETE SIDEWALK. RE-BAR INSTALLED PER APPROVED PLAN - DETAIL B ON PG #4. - OK TO POUR CONCRETE
2) TWO STORM WATER BUBBLER BOXES WERE INSTALLED WITH NO INSPECTION - ENG CERTIFICATION REQUIRED PRIOR TO FINAL APPROVAL.
3) SWEEP UP TRACKING OFF OF PUBLIC ROADWAY}
12/13/2018 SITE - Stormwater Final Inspection Passed {Activity date: 12/13/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 10/23/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - PROVIDE THE INSPECTOR THE NOTICE OF TERMINATION (NOT) THAT HAS BEEN PROVIDED FROM THE STATE FOR THIS SITE.}

Documents

File Name Document Type  
001_OVERALL SITE_1 OF 6.TIF DEVELOPMENT PACKAGE VIEW
002_PARTIAL SITE_2 OF 6.TIF DEVELOPMENT PACKAGE VIEW
003_SITE DETAILS_3 OF 6.TIF DEVELOPMENT PACKAGE VIEW
004_CIVIL_4 OF 6.TIF DEVELOPMENT PACKAGE VIEW
004_4A OF 6.TIF DEVELOPMENT PACKAGE VIEW
005_4B OF 6.TIF DEVELOPMENT PACKAGE VIEW
005_LANDSCAPE_5 OF 6.TIF DEVELOPMENT PACKAGE VIEW
006_IRRIGATION_6 OF 6.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW