Permit: DP16-0113
Permit Details
Apply Date:
07/11/2016
Applicant:
Billy Box
Description:
GRADING/SWPP
Permit Reviews
Permit Number - DP16-0113
Permit Status: Complete
Permit Description: GRADING/SWPP
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/22/2017 | REVISION - GRADING | 03/22/2017 | COMPLETED |
| 07/11/2016 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 07/11/2016 | COMPLETED |
| 07/13/2016 | GRADING | 08/16/2016 | COMPLETED |
| 09/16/2016 | GRADING | 10/24/2016 | COMPLETED |
| 11/23/2016 | GRADING | 12/22/2016 | COMPLETED |
| 12/28/2016 | GRADING | 01/11/2017 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP16-0113
Permite Description: GRADING/SWPP
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2019 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 03/05/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CONTINUE, THERE ARE NO CONCERNS AT THIS TIME, THE DEVELOPER HAS BEEN ADVISED THAT THIS SITE NEEDS SOME MINOR SWEEPING ON THE INTERIOR STREETS.} ; {Activity date: 02/06/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 01/25/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, MINOR CLEANUP REQUIRED.} ; {Activity date: 12/28/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS PRIOR TO CALLING IN FOR THE FINALS FOR THIS SITE.} ; {Activity date: 01/02/2019; Status: Continued; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - no concerns at this time.} ; {Activity date: 11/19/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 11/07/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/17/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/15/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/10/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS ITME.} ; {Activity date: 06/20/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT . WORKING ON HOUSES.} ; {Activity date: 04/20/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 01/04/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO ACTIVITY ON SITE.} ; {Activity date: 08/09/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 07/13/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO ACTIVITY ON SITE.} ; {Activity date: 04/26/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 03/21/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO ACTIVITY ON SITE.} |
Completed Inspections
Permit Status: Complete
Permit Number: DP16-0113
Permit Description: GRADING/SWPP
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/28/2018 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 12/28/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 12/28/2018 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 12/28/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/10/2017; Status: Not ready for Inspection; Inspector: DR6BERTS; Comment: Entered by DROBERT5 - 1) WADDLE INSTALLED INCORRECTLY, STAKE EVERY 4 FEET AND PROVIDE 2 FOOT OVERLAPS 2) NO TRACKOUT ROCK INSTALLED AT THE CONSTRUCTION ENTRANCE 3) PROVIDE THE CITY WITH A COPY OF THE NOI} ; {Activity date: 03/01/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE NOI . INSTALL SWPPP INFO AT GATE.} | |
| 12/28/2018 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 12/28/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/16/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 12/28/2018 | COT - ENGR - Signage Final | Passed | {Activity date: 12/28/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 03/05/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 03/05/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 03/05/2019 | ENGR Grading Final | Passed | {Activity date: 03/05/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - ALL REMAINING ITEMS WILL BE CHECKED UNDER THE FINAL GRADING INSPECTION.} ; {Activity date: 01/25/2019; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CONTACTED GEORGE AND ADVISED HIM THAT THE FORMED SIDEWALKS ON THE SOUTHSIDE OF THE ROADWAY ARE OK TO POUR AT THIS TIME, THESE AREAS WILL BE POURED NEXT WEEK, HE WILL SCHEDULE ADDITIONAL INSPECTIONS NEXT WEEK.} ; {Activity date: 01/16/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING ON HOUSE PADS.} ; {Activity date: 12/28/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS PRIOR TO CALLING IN FOR THE FINALS FOR THIS SITE.} ; {Activity date: 12/17/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING ON NEW HOMES.} ; {Activity date: 08/29/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO GRADING ACTIVITY ON SITE.} ; {Activity date: 07/03/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING ON ROCK WALL ON NORTH SIDE OF SITE.} ; {Activity date: 05/11/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GATE LOCKED NO ONE ON SITE.} ; {Activity date: 01/25/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO ACTIVITY ON SITE.} ; {Activity date: 12/15/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO ACTIVITY ON SITE.} ; {Activity date: 09/05/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING IN RIGHT OF WAY ON SIDE WALKS.} ; {Activity date: 08/17/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO ACTIVITY ON SITE.} ; {Activity date: 08/02/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO ACTIVITY ON SITE.} ; {Activity date: 07/06/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO ACTIVITY ON SITE.} ; {Activity date: 04/11/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING IN RIGHT OF WAY.} ; {Activity date: 03/16/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - SURVEYORS ON SITE ONLY.} | |
| 08/05/2019 | ENGR Engineering Final | Passed | {Activity date: 08/05/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } ; {Activity date: 03/05/2019; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE IS NOT READY AT THIS TIME FOR THIS FINAL INSPECTION, THIS WILL BE SCHEDULED FOR A LATER DATE.} ; {Activity date: 12/28/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS PRIOR TO CALLING IN FOR THE FINALS FOR THIS SITE.} | |
| 08/05/2019 | SITE - Stormwater Final Inspection | Passed | {Activity date: 08/05/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - } ; {Activity date: 03/05/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS SITE IS NOT READY FOR THIS INSPECTION AT THIS TIME, THIS WILL BE CALLED IN WITH THE FINALS FOR THE SITE.} |