Permit: DP16-0096
Permit Details
Apply Date:
06/06/2016
Applicant:
Description:
REMOVE DRIVE THROUGH STRUCTURE AND SITE RECONFIGURATION; COMM
Permit Reviews
Permit Number - DP16-0096
Permit Status: Complete
Permit Description: REMOVE DRIVE THROUGH STRUCTURE AND SITE RECONFIGURATION; COMM
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/06/2016 | DEV PKG - OK TO SUBMIT | 06/06/2016 | COMPLETED |
06/07/2016 | SITE and/or GRADING | 08/05/2016 | COMPLETED |
08/05/2016 | SITE and/or GRADING | 09/12/2016 | COMPLETED |
09/12/2016 | RESUB - SITE and/or GRADING | 09/14/2016 | COMPLETED |
09/14/2016 | RESUB - SITE and/or GRADING | 02/23/2017 | COMPLETED |
Outstanding Activity Conditions
Permit Number - DP16-0096
Permit Status: Complete
Permit Description: REMOVE DRIVE THROUGH STRUCTURE AND SITE RECONFIGURATION; COMM
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
09/02/2016 | Recordation of cross-access or joint-use must be approved before letter of completion. |
Completed Inspections
Permit Status: Complete
Permit Number: DP16-0096
Permit Description: REMOVE DRIVE THROUGH STRUCTURE AND SITE RECONFIGURATION; COMM
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/27/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 02/27/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE THEREFORE NO SWPPP IS REQUIRED 2) CALL FOR INSPECTION PRIOR TO COVERING ANY UNDERGROUND SITE WORK 3) ENSURE ALL PEDESTRIAN ACCESS AND HC PARKING MEET APPLICABLE ADA REQUIREMENTS 4) ENSURE ANY SIGNIFICANT SITE CHANGES ARE SHOWN ON PLANS 5) INSPECTED RE-BAR FOR TRASH ENCLOSURE - INSTALLED PER PLAN - OK TO POUR} |
|
03/23/2017 | SITE - Stormwater Follow-up | Passed | {Activity date: 03/23/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/23/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - I HAVE ADVISED THE CONTRACTOR THAT HE NEEDS TO GO AND PAY FOR THE PLANS AND PICK UP THE PERMIT SO THAT IT IS PLACED INTO ISSUED STATUS. HAVE ALSO ADVISED HIM THAT HE NEEDS TO CONTACT AND APPLY FOR THE NOI FOR THIS SITE SINCE A SWPPP IS REQUIRED. HE WILL PICK UP THE PLAN AND SCHEDULE A PRECON MEETING FOR TOMORROW. HE WILL ALSO CONTACT AND APPLY FOR THE NOTICE OF INTENT FOR THIS SITE. THERE ARE NO CONCERNS AT THIS TIME FOR THIS SITE IN REGARDS TO TRACK OUT.} |
|
03/23/2017 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 03/23/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
04/24/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 04/24/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
04/24/2017 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 04/24/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
04/24/2017 | ENGR Engineering Final | Passed | {Activity date: 04/24/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/23/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CHANGE TO PARKING AND ACCESS DUE TO ADJACENT DEVELOPMENT 2) PROVIDE A REVISED PLAN SHOWING CHANGES MADE TO THE SITE WITH THE COT APPROVAL.} |
|
04/24/2017 | ENGR Grading Final | Passed | {Activity date: 04/24/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
04/24/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 04/24/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
04/24/2017 | COT - ENGR - Signage Final | Passed | {Activity date: 04/24/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } |