Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
In Revision
Type:
Development Package
Apply Date:
05/20/2016
Applicant:
Lisa Bowers
Description:
SITE/GRADING/SWPPP/IID - MERCADO SAN AUGUSTIN ANNEX 1st Revision approved 9/13/17 (1-5, 7-8, 10-

Permit Reviews

Permit Number - DP16-0084
Permit Status: In revision
Permit Description: SITE/GRADING/SWPPP/IID - MERCADO SAN AUGUSTIN ANNEX 1st Revision approved 9/13/17 (1-5, 7-8, 10-
Start Date Submittal Complete Date Status  
05/20/2016 DEV PKG - OK TO SUBMIT 05/20/2016 COMPLETED Review Details
05/23/2016 DEV PKG 07/29/2016 COMPLETED Review Details
07/06/2017 DEV PKG - REVISION 08/03/2017 COMPLETED Review Details
07/29/2016 DEV PKG - RESUBMITTAL 11/15/2016 COMPLETED Review Details
08/21/2018 DEV PKG - REVISION 08/27/2018 COMPLETED Review Details
08/27/2018 DEV PKG - REVISION 11/06/2018 COMPLETED Review Details
08/29/2017 DEV PKG - REVISION 09/14/2017 COMPLETED Review Details
11/09/2018 DEV PKG - REVISION 11/09/2018 COMPLETED Review Details
11/09/2018 DEV PKG - REVISION 02/25/2021 COMPLETED Review Details
11/15/2016 DEV PKG - RESUBMITTAL 12/01/2016 COMPLETED Review Details
12/01/2016 DEV PKG - RESUBMITTAL 07/06/2017 COMPLETED Review Details
12/28/2017 DEV PKG - REVISION 01/25/2018 COMPLETED Review Details

Completed Inspections

Permit Status: In Revision
Permit Number: DP16-0084
Permit Description: SITE/GRADING/SWPPP/IID - MERCADO SAN AUGUSTIN ANNEX 1st Revision approved 9/13/17 (1-5, 7-8, 10-
Total Completed Inspections - 9
Date Description Inspector Results Comments
08/22/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/22/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
03/21/2018 PDSD Site/Engineering Division - NPPO Passed {Activity date: 03/21/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
03/21/2018 COT - ENGR - Signage Final Passed {Activity date: 03/21/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
08/06/2018 SITE - Stormwater Setup and Controls Passed {Activity date: 08/06/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/22/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC REP ON SITE FOR PRE-CON . NEEDS TO PROVIDE NOI POST SWPPP INFO AT GATE. COMPLET INSTALLING ALL SWPPP CONTROLS.}
10/17/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/17/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 08/06/2018; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE AS SHOWN ON THE APPROVED PLANS}
10/17/2018 SITE - Stormwater Follow-up Passed {Activity date: 10/17/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 03/21/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 03/20/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS ON THIS SITE AT THIS TIME, THE STORMWATER CONTROLS ARE WORKING AT THIS TIME.} ; {Activity date: 02/28/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/24/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/10/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT.} ; {Activity date: 01/03/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 12/06/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 11/20/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/16/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 10/03/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME} ; {Activity date: 09/18/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 09/06/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC REP ON SITE ABOUT HANGING SWPPP SIGN AT GATE.}
10/17/2018 ENGR Grading Final Passed {Activity date: 10/17/2018; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 05/01/2018; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - LISA BAUR CALLED TO SEE IF I COULD STOP BY TO LOOK OVER SITE TO SEE IF IT WAS READY FOR AN EVENT TO NIGHT. IT WAS NOT READY.} ; {Activity date: 04/03/2018; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - ALL AREA DRAINS HAVE GRATES INSTALLED . BUT THE ONE ON THE SOUTH EAST SIDE OF SITE.} ; {Activity date: 03/20/2018; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH THE CONTRACTOR AND LOOKED OVER THE SITE WORK THAT HAS BEEN COMPLETED AT THIS TIME. THE WATER SYSTEM PIPING HAS BEEN INSTALLED AND BURIED WITHOUT ANY INSPECTIONS BEING CALLED IN. I HAVE ADVISED THE CONTRACTOR THAT THIS WORK EITHER NEEDS TO BE EXPOSED SO THAT WE CAN INSPECT THE PIPES, PROVIDE US WITH A VIDEO TAPE OF ALL THE PIPE MAIN RUNS FOR VERIFICATION, OR THEY CAN PROVIDE A WATER TEST ON ALL OF THE LINES TO VERIFY THAT THEY ARE WATER TIGHT. THEY HAVE CHOSEN THE WATER TEST. IF THERE ARE ANY LEAKS NOTED THEN THEY WILL HAVE TO DID UP THE PIPES TILL THEY FIND THE LEAK.
ALSO THEY HAVE BEEN ADVISED THAT THEY NEED TO BE CALLING IN A STORMWATER INSPECTION EVERY 2 WEEKS AND AN INTERMEDIATE GRADING FOR ALL OTHER INSPECTIONS THAT THEY NEED FOR THIS SITE PLAN.} ; {Activity date: 03/19/2018; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - UNCOVER STROM WATER PIPING OR PROVIDE HISTORY OF INSPECTIONS.} ; {Activity date: 03/15/2018; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE HISTORY FOR STORM WATER PIPING INSPECTIONS.} ; {Activity date: 10/03/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE WORK THAT IS IN PROGRESS ON THIS SITE AT THIS TIME IS AS FOLLOWS:
1) THE CREWS ARE PLACING BEDDING AND SHADING MATERIAL AT VARIOUS LOCATIONS THROUGHOUT THIS SITE.
2) THE SEWER LINES IN SOME OF THE LOCATIONS HAVE THE SHADING MATERIAL PLACED OVER THE PIPES AND IS CURRENTLY INSTALLING A LIFT OF BACKFILL SO THAT THIS WORK CAN BE STARTED. THESE AREAS ARE BEING COMPACTED AT THIS TIME AND WILL LATER BE TESTED TO ENSURE THAT THEY HAVE MET THE MINIMUM COMPACTION FOR THE BACKFILL AS REQUIRED.
3) INTERNAL AND EXTERNAL FRAMING OF THE SITES ARE HAPPENING AT THIS TIME, AND WILL CONTINUE TILL ALL OF THE WORK HAS BEEN COMPLETED IN THE FUTURE.
4) INSTALLATION OF THE DRY UTILITY RUNS ARE BEING PLACED AS NEEDED THROUGHOUT THE SITE. THIS WORK IS BEING INSPECTED BY THE BUILDING INSPECTORS FOR THE COMPLETNESS OF ALL THE WORK PER THE APPROVED CODES.}
12/17/2018 ENGR Engineering Final Passed {Activity date: 12/17/2018; Status: Approved; Inspector: JV; Comment: Entered by JVWINKL1 - NOT and CERT LETTER PROVIDED. UPLOADED TO PRO} ; {Activity date: 10/17/2018; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE CERT LETTER FOR ALL GRADING AND DRAINAGE ON AP PLANS. REMOVE TEMPORARY FENCING FROM SITE. PROVIDE NOT.} ; {Activity date: 05/04/2018; Status: Denied; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE ALL SITE/GRADING/LANDSCAPING PER THE APPROVED PLAN - CALL FOR RE-INSPECTION}
12/17/2018 SITE - Stormwater Final Inspection Passed {Activity date: 12/17/2018; Status: Approved; Inspector: JV; Comment: Entered by JVWINKL1 - NOT PROVIDED} ; {Activity date: 10/17/2018; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE NOT}

Documents

File Name Document Type  
001_MASTER COVER_1 OF 25.TIF DEVELOPMENT PACKAGE VIEW
002_DEMOLITION_2 OF 25.TIF DEVELOPMENT PACKAGE VIEW
003_SITE_3 OF 25.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING / PAVING / DRAINAGE / DETAILS_4 OF 25.TIF DEVELOPMENT PACKAGE VIEW
005_GRADING / PAVING / DRAINAGE / DETAILS_5 OF 25.TIF DEVELOPMENT PACKAGE VIEW
006_GRADING / PAVING / DRAINAGE / DETAILS_6 OF 25.TIF DEVELOPMENT PACKAGE VIEW
007_PRIVATE UTILITY_7 OF 25.TIF DEVELOPMENT PACKAGE VIEW
008_DETAILS / IID INFORMATION_8 OF 25.TIF DEVELOPMENT PACKAGE VIEW
009_OFFSITE PARKING_9 OF 25.TIF DEVELOPMENT PACKAGE VIEW
010_NOTES / DETAILS_10 OF 25.TIF DEVELOPMENT PACKAGE VIEW
011_NOTES / DETAILS_11 OF 25.TIF DEVELOPMENT PACKAGE VIEW
012_SWPPP_12 OF 25.TIF DEVELOPMENT PACKAGE VIEW
013_SWPPP_13 OF 25.TIF DEVELOPMENT PACKAGE VIEW
014_SWPPP_14 OF 25.TIF DEVELOPMENT PACKAGE VIEW
015_SWPPP_15 OF 25.TIF DEVELOPMENT PACKAGE VIEW
016_SWPPP_16 OF 25.TIF DEVELOPMENT PACKAGE VIEW
017_LANDSCAPE / RAINWATER HARVESTING_17 OF 25.TIF DEVELOPMENT PACKAGE VIEW
018_LANDSCAPE / RAINWATER HARVESTING_18 OF 25.TIF DEVELOPMENT PACKAGE VIEW
019_LANDSCAPE / RAINWATER HARVESTING_19 OF 25.TIF DEVELOPMENT PACKAGE VIEW
020_LANDSCAPE / RAINWATER HARVESTING_20 OF 25.TIF DEVELOPMENT PACKAGE VIEW
021_LANDSCAPE / RAINWATER HARVESTING_21 OF 25.TIF DEVELOPMENT PACKAGE VIEW
022_LANDSCAPE / RAINWATER HARVESTING_22 OF 25.TIF DEVELOPMENT PACKAGE VIEW
023_LANDSCAPE / RAINWATER HARVESTING_23 OF 25.TIF DEVELOPMENT PACKAGE VIEW
024_LANDSCAPE / RAINWATER HARVESTING_24 OF 25.TIF DEVELOPMENT PACKAGE VIEW
025_LANDSCAPE / RAINWATER HARVESTING_25 OF 25.TIF DEVELOPMENT PACKAGE VIEW
ADDRESSINGCOMMENTS ON 1D_DP_MERCADO SAN AGUSTIN ANNEX_RLF_1.PDF DOCUMENTS VIEW
ADDRESSING 1D_DP_MERCADO SAN AGUSTIN ANNEX_RLF2.PDF DOCUMENTS VIEW
ADDRESS 2B_DP_MERCADO SAN AGUSTIN ANNEX_RFC.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
TERRACON GEOTECH.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
68306_TERMINATE_SUMMARY_COR (1).PDF DOCUMENTS VIEW
SKM_C364E18121710130.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW