Permit: DP16-0084

Parcel: 11620636B

Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP16-0084

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
08/06/2018 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
08/06/2018 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
08/17/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ON SITE ABOUT CALLING FOR PRE-CON.
08/11/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY ON SITE.
10/17/2018 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
04/12/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - REBAR MAT FOR TRASH ENCLOUSRE OK.
04/05/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - MAT FOR TRASH ENCLOUSURE COMPLET. STORM DRAIN ON SOUTH EAST SIDE OF SITE INSTALLED.
10/17/2018 ENGR Grading Final RLEDONNE Approved Entered by RLEDONN1 -
05/01/2018 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by RLEDONN1 - LISA BAUR CALLED TO SEE IF I COULD STOP BY TO LOOK OVER SITE TO SEE IF IT WAS READY FOR AN EVENT TO NIGHT. IT WAS NOT READY.
04/03/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - ALL AREA DRAINS HAVE GRATES INSTALLED . BUT THE ONE ON THE SOUTH EAST SIDE OF SITE.
03/20/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - MET WITH THE CONTRACTOR AND LOOKED OVER THE SITE WORK THAT HAS BEEN COMPLETED AT THIS TIME. THE WATER SYSTEM PIPING HAS BEEN INSTALLED AND BURIED WITHOUT ANY INSPECTIONS BEING CALLED IN. I HAVE ADVISED THE CONTRACTOR THAT THIS WORK EITHER NEEDS TO BE EXPOSED SO THAT WE CAN INSPECT THE PIPES, PROVIDE US WITH A VIDEO TAPE OF ALL THE PIPE MAIN RUNS FOR VERIFICATION, OR THEY CAN PROVIDE A WATER TEST ON ALL OF THE LINES TO VERIFY THAT THEY ARE WATER TIGHT. THEY HAVE CHOSEN THE WATER TEST. IF THERE ARE ANY LEAKS NOTED THEN THEY WILL HAVE TO DID UP THE PIPES TILL THEY FIND THE LEAK. ALSO THEY HAVE BEEN ADVISED THAT THEY NEED TO BE CALLING IN A STORMWATER INSPECTION EVERY 2 WEEKS AND AN INTERMEDIATE GRADING FOR ALL OTHER INSPECTIONS THAT THEY NEED FOR THIS SITE PLAN.
03/19/2018 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by RLEDONN1 - UNCOVER STROM WATER PIPING OR PROVIDE HISTORY OF INSPECTIONS.
03/15/2018 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by RLEDONN1 - PROVIDE HISTORY FOR STORM WATER PIPING INSPECTIONS.
10/03/2017 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE WORK THAT IS IN PROGRESS ON THIS SITE AT THIS TIME IS AS FOLLOWS: 1) THE CREWS ARE PLACING BEDDING AND SHADING MATERIAL AT VARIOUS LOCATIONS THROUGHOUT THIS SITE. 2) THE SEWER LINES IN SOME OF THE LOCATIONS HAVE THE SHADING MATERIAL PLACED OVER THE PIPES AND IS CURRENTLY INSTALLING A LIFT OF BACKFILL SO THAT THIS WORK CAN BE STARTED. THESE AREAS ARE BEING COMPACTED AT THIS TIME AND WILL LATER BE TESTED TO ENSURE THAT THEY HAVE MET THE MINIMUM COMPACTION FOR THE BACKFILL AS REQUIRED. 3) INTERNAL AND EXTERNAL FRAMING OF THE SITES ARE HAPPENING AT THIS TIME, AND WILL CONTINUE TILL ALL OF THE WORK HAS BEEN COMPLETED IN THE FUTURE. 4) INSTALLATION OF THE DRY UTILITY RUNS ARE BEING PLACED AS NEEDED THROUGHOUT THE SITE. THIS WORK IS BEING INSPECTED BY THE BUILDING INSPECTORS FOR THE COMPLETNESS OF ALL THE WORK PER THE APPROVED CODES.