Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP16-0084
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/06/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
08/06/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
08/17/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ON SITE ABOUT CALLING FOR PRE-CON. |
08/11/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
10/17/2018 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
04/12/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - REBAR MAT FOR TRASH ENCLOUSRE OK. |
04/05/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MAT FOR TRASH ENCLOUSURE COMPLET. STORM DRAIN ON SOUTH EAST SIDE OF SITE INSTALLED. |
10/17/2018 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
05/01/2018 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - LISA BAUR CALLED TO SEE IF I COULD STOP BY TO LOOK OVER SITE TO SEE IF IT WAS READY FOR AN EVENT TO NIGHT. IT WAS NOT READY. |
04/03/2018 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - ALL AREA DRAINS HAVE GRATES INSTALLED . BUT THE ONE ON THE SOUTH EAST SIDE OF SITE. |
03/20/2018 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - MET WITH THE CONTRACTOR AND LOOKED OVER THE SITE WORK THAT HAS BEEN COMPLETED AT THIS TIME. THE WATER SYSTEM PIPING HAS BEEN INSTALLED AND BURIED WITHOUT ANY INSPECTIONS BEING CALLED IN. I HAVE ADVISED THE CONTRACTOR THAT THIS WORK EITHER NEEDS TO BE EXPOSED SO THAT WE CAN INSPECT THE PIPES, PROVIDE US WITH A VIDEO TAPE OF ALL THE PIPE MAIN RUNS FOR VERIFICATION, OR THEY CAN PROVIDE A WATER TEST ON ALL OF THE LINES TO VERIFY THAT THEY ARE WATER TIGHT. THEY HAVE CHOSEN THE WATER TEST. IF THERE ARE ANY LEAKS NOTED THEN THEY WILL HAVE TO DID UP THE PIPES TILL THEY FIND THE LEAK. ALSO THEY HAVE BEEN ADVISED THAT THEY NEED TO BE CALLING IN A STORMWATER INSPECTION EVERY 2 WEEKS AND AN INTERMEDIATE GRADING FOR ALL OTHER INSPECTIONS THAT THEY NEED FOR THIS SITE PLAN. |
03/19/2018 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - UNCOVER STROM WATER PIPING OR PROVIDE HISTORY OF INSPECTIONS. |
03/15/2018 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - PROVIDE HISTORY FOR STORM WATER PIPING INSPECTIONS. |
10/03/2017 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - THE WORK THAT IS IN PROGRESS ON THIS SITE AT THIS TIME IS AS FOLLOWS: 1) THE CREWS ARE PLACING BEDDING AND SHADING MATERIAL AT VARIOUS LOCATIONS THROUGHOUT THIS SITE. 2) THE SEWER LINES IN SOME OF THE LOCATIONS HAVE THE SHADING MATERIAL PLACED OVER THE PIPES AND IS CURRENTLY INSTALLING A LIFT OF BACKFILL SO THAT THIS WORK CAN BE STARTED. THESE AREAS ARE BEING COMPACTED AT THIS TIME AND WILL LATER BE TESTED TO ENSURE THAT THEY HAVE MET THE MINIMUM COMPACTION FOR THE BACKFILL AS REQUIRED. 3) INTERNAL AND EXTERNAL FRAMING OF THE SITES ARE HAPPENING AT THIS TIME, AND WILL CONTINUE TILL ALL OF THE WORK HAS BEEN COMPLETED IN THE FUTURE. 4) INSTALLATION OF THE DRY UTILITY RUNS ARE BEING PLACED AS NEEDED THROUGHOUT THE SITE. THIS WORK IS BEING INSPECTED BY THE BUILDING INSPECTORS FOR THE COMPLETNESS OF ALL THE WORK PER THE APPROVED CODES. |