Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
801 E 12TH ST
Apply Date:
04/25/2016
Applicant:
Description:
SITE/GRADING/SWPPP - NEW BUS TERMINAL AND PARKING

Permit Reviews

Permit Number - DP16-0071
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - NEW BUS TERMINAL AND PARKING
Start Date Submittal Complete Date Status  
04/25/2016 DEV PKG - OK TO SUBMIT 04/25/2016 COMPLETED Review Details
04/25/2016 SITE and/or GRADING 05/24/2016 COMPLETED Review Details
05/26/2016 RESUB - SITE and/or GRADING 06/28/2016 COMPLETED Review Details
06/28/2016 RESUB - SITE and/or GRADING 07/07/2016 COMPLETED Review Details
07/07/2016 RESUB - SITE and/or GRADING 08/23/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0071
Permit Description: SITE/GRADING/SWPPP - NEW BUS TERMINAL AND PARKING
Total Completed Inspections - 9
Date Description Inspector Results Comments
08/30/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/30/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC . CLEAN STREETS OF TRACK OUT.}
01/19/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 01/19/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/19/2017 SITE - Stormwater Follow-up Passed {Activity date: 01/19/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 12/23/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 12/07/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 11/09/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/18/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS ATTHIS TIME.} ; {Activity date: 09/28/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT PROVIDING WASH OUT.}
01/19/2017 SITE - Stormwater Final Inspection Passed {Activity date: 01/19/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/19/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 01/19/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
03/09/2017 COT - ENGR - Signage Final Passed {Activity date: 03/09/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
03/23/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 03/23/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by KROBLES1 - }
03/23/2017 ENGR Engineering Final Passed {Activity date: 03/23/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by KROBLES1 - } ; {Activity date: 03/10/2017; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE CERT LETTER FOR ALL DRAINAGE AND GRADING FROM ENGINEER OF RECORD. COMPLET ALL ROOF DRAINS. FASTEN ADA PARKING SIGNS TO BUILDING. COMPLET ALL LANDSCAPING ON SITE.} ; {Activity date: 03/09/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - REMOVE ALL CONSTRUCTION EQUIPMENT FROM PARKING AREAS. INSTALL BIKE PARKING. PROVIDE COT AP CHANGES FOR BUS PARKING AREAS. REMOVE TEMP FENCEING AROUND SITE. REMOVE ALL TRASH FROM SITE.}
03/23/2017 ENGR Grading Final Passed {Activity date: 03/23/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by KROBLES1 - }

Documents

File Name Document Type  
001_COVER SHEET_C1.0.TIF DEVELOPMENT PACKAGE VIEW
002_NOTES / LEGEND_C1.1.TIF DEVELOPMENT PACKAGE VIEW
003_DEMOLITION_C2.0.TIF DEVELOPMENT PACKAGE VIEW
004_SITE_C3.0.TIF DEVELOPMENT PACKAGE VIEW
005_GRADING_C4.0.TIF DEVELOPMENT PACKAGE VIEW
006_PRIVATE UTILITY_C5.0.TIF DEVELOPMENT PACKAGE VIEW
007_SECTIONS / DETAILS_C6.0.TIF DEVELOPMENT PACKAGE VIEW
008_SECTIONS / DETAILS_C6.1.TIF DEVELOPMENT PACKAGE VIEW
014_SECTIONS / DETAILS_C6.2.TIF DEVELOPMENT PACKAGE VIEW
013_HORIZONTAL CONTROL_C7.0.TIF DEVELOPMENT PACKAGE VIEW
012_NPPP_N1.0.TIF DEVELOPMENT PACKAGE VIEW
011_LANDSCAPE_L1.0.TIF DEVELOPMENT PACKAGE VIEW
010_IRRIGATION_L2.0.TIF DEVELOPMENT PACKAGE VIEW
009_LANDSCAPE DETAILS_L3.0.TIF DEVELOPMENT PACKAGE VIEW
015_IRRIGATION DETAILS_L3.1.TIF DEVELOPMENT PACKAGE VIEW
001_DRAINAGE EXHIBIT_FIG1.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW
GEOTECHNICAL EVALUATION.PDF DOCUMENTS VIEW
DRAINAGE STATEMENT.PDF DOCUMENTS VIEW