Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Issued
Type:
Development Package
Address:
4500 N ORACLE RD
Address NEW:
4500 N ORACLE RD
Apply Date:
03/22/2016
Applicant:
Description:
SITE

Permit Reviews

Permit Number - DP16-0050
Permit Status: Issued
Permit Description: SITE
Start Date Submittal Complete Date Status  
03/22/2016 SITE and/or GRADING 04/21/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Issued
Permit Number: DP16-0050
Permit Description: SITE
Total Completed Inspections - 8
Date Description Inspector Results Comments
07/06/2016 PDSD Site/Engineering Division - NPPO Passed {Activity date: 07/06/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - }
07/06/2016 SITE - Stormwater Follow-up Passed {Activity date: 07/06/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 05/09/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) CONTRACTOR INSTALLED THREE PRE-CAST CATCH BASINS W/ 10" AND 12" PVC PIPE CONNECTING. TIE-IN TO AND EXISTING CATCH BASIN WAS ALSO DONE - OK TO COVER
2) NEW PARKING AREA TO BE BUILT WITH ADA PARKING AND ACCESS
3) SITE IS < 1 ACRE THERFOR A STORM WATER PERMIT AND SWPPP IS NOT REQUIRED}
07/06/2016 SITE - Stormwater Final Inspection Passed {Activity date: 07/06/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - ENSURE A NOTICE OF TERMINATION IS FILED IF REQUIRED}
07/06/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 07/06/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - }
07/06/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/06/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 05/20/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO PRE-CON WAS CALLED IN FOR INSPECTION}
07/06/2016 COT - ENGR - Signage Final Passed {Activity date: 07/06/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - }
10/24/2016 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/24/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - }
10/24/2016 ENGR Engineering Final Passed {Activity date: 10/24/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 05/20/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) INSPECTED THREE LIGHT POLE BASES IN PARKING LOT. BASES INSTALLED PER YOUR STANDARD DETAIL; HOWEVER YOU MUST PROVIDE A STAMPED APPROVAL FOR THE LIGHT POLE/BASE INSTALLATION. NO DETAILS WERE SHOWN ON THE APPROVED PLANS - OK TO INSTALL AT CONTRACTORS RISK
2) PRIO TO FINAL APPROVAL PROVIDE AN APPROVED PLAN THAT SHOWS WHAT WAS CONSTRUCTED.
3) PRIOR TO FINAL APPROVAL, PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE SITE/GRADING WAS COMPLETED PER THE APPROVED PLANS}