Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 07/06/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Approved |
Entered by MRUSSO1 - |
| 05/09/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by MRUSSO1 - 1) CONTRACTOR INSTALLED THREE PRE-CAST CATCH BASINS W/ 10" AND 12" PVC PIPE CONNECTING. TIE-IN TO AND EXISTING CATCH BASIN WAS ALSO DONE - OK TO COVER
2) NEW PARKING AREA TO BE BUILT WITH ADA PARKING AND ACCESS
3) SITE IS < 1 ACRE THERFOR A STORM WATER PERMIT AND SWPPP IS NOT REQUIRED |