Permit: DP16-0050
Permit Details
Apply Date:
03/22/2016
Applicant:
Description:
SITE
Permit Reviews
Permit Number - DP16-0050
Permit Status: Issued
Permit Description: SITE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/22/2016 | SITE and/or GRADING | 04/21/2016 | COMPLETED |
Completed Inspections
Permit Status: Issued
Permit Number: DP16-0050
Permit Description: SITE
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/06/2016 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 07/06/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } | |
07/06/2016 | SITE - Stormwater Follow-up | Passed | {Activity date: 07/06/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 05/09/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) CONTRACTOR INSTALLED THREE PRE-CAST CATCH BASINS W/ 10" AND 12" PVC PIPE CONNECTING. TIE-IN TO AND EXISTING CATCH BASIN WAS ALSO DONE - OK TO COVER 2) NEW PARKING AREA TO BE BUILT WITH ADA PARKING AND ACCESS 3) SITE IS < 1 ACRE THERFOR A STORM WATER PERMIT AND SWPPP IS NOT REQUIRED} |
|
07/06/2016 | SITE - Stormwater Final Inspection | Passed | {Activity date: 07/06/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - ENSURE A NOTICE OF TERMINATION IS FILED IF REQUIRED} | |
07/06/2016 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 07/06/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } | |
07/06/2016 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 07/06/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 05/20/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO PRE-CON WAS CALLED IN FOR INSPECTION} | |
07/06/2016 | COT - ENGR - Signage Final | Passed | {Activity date: 07/06/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } | |
10/24/2016 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 10/24/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } | |
10/24/2016 | ENGR Engineering Final | Passed | {Activity date: 10/24/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 05/20/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) INSPECTED THREE LIGHT POLE BASES IN PARKING LOT. BASES INSTALLED PER YOUR STANDARD DETAIL; HOWEVER YOU MUST PROVIDE A STAMPED APPROVAL FOR THE LIGHT POLE/BASE INSTALLATION. NO DETAILS WERE SHOWN ON THE APPROVED PLANS - OK TO INSTALL AT CONTRACTORS RISK 2) PRIO TO FINAL APPROVAL PROVIDE AN APPROVED PLAN THAT SHOWS WHAT WAS CONSTRUCTED. 3) PRIOR TO FINAL APPROVAL, PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE SITE/GRADING WAS COMPLETED PER THE APPROVED PLANS} |