Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
3375 E CORONA RD
Apply Date:
03/17/2016
Applicant:
Description:
NEW OFFICE/CROSSBLOCK TERMINAL -SITE, GRADING, SWPPP

Permit Reviews

Permit Number - DP16-0046
Permit Status: Complete
Permit Description: NEW OFFICE/CROSSBLOCK TERMINAL -SITE, GRADING, SWPPP
Start Date Submittal Complete Date Status  
03/17/2016 DEV PKG - OK TO SUBMIT 04/04/2016 COMPLETED Review Details
04/04/2016 SITE and/or GRADING 06/13/2016 COMPLETED Review Details
04/20/2017 REVISION - SITE 04/20/2017 COMPLETED Review Details
06/13/2016 RESUB - SITE and/or GRADING 07/08/2016 COMPLETED Review Details
07/08/2016 RESUB - SITE and/or GRADING 07/08/2016 COMPLETED Review Details
11/29/2016 REVISION - SITE 11/29/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0046
Permit Description: NEW OFFICE/CROSSBLOCK TERMINAL -SITE, GRADING, SWPPP
Total Completed Inspections - 10
Date Description Inspector Results Comments
07/29/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/29/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
08/08/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 08/08/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
04/21/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 04/21/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/14/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - I CONTACTED JOSEPH LINVILLE AND WE DISCUSSED THE CHANGES THAT HAVE BEEN MADE IN THE FIELD.WE WILL ACCEPT MINOR MOVEMENT OF PLANTS IN A GENERAL AREA. WE WILL NOT ACCEPT WITHOUT DRAWINGS ANY CHANGES THAT HAVE REMOVED PLANTS OR TREES FROM ONE AREA AND HAVE BEEN PLACED IN ANOTHER AREA. I WILL BE ASKING THE CONTRACTOR TO HAVE THE REVISED DRAWINS REVIEWED AND APPROVED BEFORE WE ACCEPT THE WORK IN THE FIELD. ALL OTHER WORK IN THE FIELD THAT MATCHES THE APPROVED PLANS CAN BE ACCEPTED AT THIS TIME.} ; {Activity date: 04/14/2017; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE HAS BEEN CHECKED AND CHANGES HAVE BEEN MADE TO THE SITE, BUT THERE IS NO REVISED DRAWINGS FOR THE CHANGES. I ASKED THE CONTRACTOR TO HAVE THE CONTRACTOR SUBMIT THE CHANGES TO JOSEPH LINVILLE SO THAT THIS SITE CAN BE INSPECTED LATER WITH A SET OF REVISED DRAWINGS. HE ADVISED ME THAT THE EOR HAS ALREADY HAD THE CHANGES APPROVED BY JOSEPH AND IT WILL BE HANDLED AS A TIER 1 REVIEW WHERE THE FIELD INSPECTOR CAN ACCEPT THE CHANGES WITHOUT A REVISED DRAWING.} ; {Activity date: 04/19/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CHANGES HAVE BEEN MADE TO THIS SITE IN THE EASTERN PARKING LOTS. TREES HAVE BEEN REMOVED FROM THE ENTRANCES AND HAVE BEEN PLACED IN OTHER LOCATIONS ON THE SITE. I HAVE ASKED THE CONTRACTOR TO CONTACT THE ENGINEER OF RECORD AND HAVE THESE CHANGES SUBMITTED FOR APPROVAL.} ; {Activity date: 04/18/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MINOR CHANGES HAVE BEEN MADE IN THE PARKING LOTS ON THE EAST SIDE OF THE SITE, THESE NEED TO NOTED ON REVISED DRAWINGS FOR THIS SITE.}
04/21/2017 RSBU - Building Final Passed {Activity date: 04/21/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/21/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 04/21/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/21/2017 ENGR Engineering Final Passed {Activity date: 04/21/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/21/2017 SITE - Stormwater Follow-up Passed {Activity date: 04/21/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/27/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - CONCRETE WASH OUT HAS BEEN REMOVED. NO CONCERNS AT THIS TIME.} ; {Activity date: 02/06/2017; Status: Continued; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - CLEAN OUT CONCRETE WASH OUT AND PROVIDE AP WASH OUT.ON SITE.} ; {Activity date: 02/01/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT PROVIDING AP WASH OUT.} ; {Activity date: 01/23/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/19/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/28/2016; Status: Continued; Inspector: RLEDONN; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 12/22/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT TRACK OUT AND ADDING ROCK.} ; {Activity date: 12/06/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 11/14/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 11/01/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/18/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/14/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/10/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/05/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 09/28/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT CLEANING AROUND CONCRETE WASH OUT.} ; {Activity date: 09/06/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/23/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/15/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - SWPPP INFO INSTALLED .} ; {Activity date: 08/02/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO ACTIVTITY ON SITE.}
04/21/2017 ENGR Grading Final Passed {Activity date: 04/21/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/21/2017 SITE - Stormwater Final Inspection Passed {Activity date: 04/21/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
04/21/2017 COT - ENGR - Signage Final Passed {Activity date: 04/21/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_COVER SHEET_C-0.TIF DEVELOPMENT PACKAGE VIEW
002_SITE_A101.TIF DEVELOPMENT PACKAGE VIEW
003_SITE PLAN DETAILS_A102.TIF DEVELOPMENT PACKAGE VIEW
004_SITE DETAILS_A103.TIF DEVELOPMENT PACKAGE VIEW
005_SITE PLAN ENLARGED_A104.TIF DEVELOPMENT PACKAGE VIEW
006_PAVEMENT_A105.TIF DEVELOPMENT PACKAGE VIEW
007_RAMP DETAIL_A508.TIF DEVELOPMENT PACKAGE VIEW
008_EXISTING CONDITIONS_C-1.TIF DEVELOPMENT PACKAGE VIEW
009_GRADING_C-2.TIF DEVELOPMENT PACKAGE VIEW
010_UTILITY_C-3.TIF DEVELOPMENT PACKAGE VIEW
011_DETAILS_C-4.TIF DEVELOPMENT PACKAGE VIEW
012_SWPPP_C-5.TIF DEVELOPMENT PACKAGE VIEW
013_SWPPP DETAILS_C-6.TIF DEVELOPMENT PACKAGE VIEW
014_LANDSCAPE NOTES_L-01.TIF DEVELOPMENT PACKAGE VIEW
015_LANDSCAPE DETAILS_L-02.TIF DEVELOPMENT PACKAGE VIEW
016_LANDSCAPE SPECIFICATIONS_L-03.TIF DEVELOPMENT PACKAGE VIEW
017_LANDSCAPE SPECIFICATIONS_L-04.TIF DEVELOPMENT PACKAGE VIEW
018_LANDSCAPE SPECIFICATIONS_L-05.TIF DEVELOPMENT PACKAGE VIEW
019_PLANTING / IRRIGATION LEGENDS_L-06.TIF DEVELOPMENT PACKAGE VIEW
020_PLANTING_L-07.TIF DEVELOPMENT PACKAGE VIEW
021_IRRIGATION_L-08.TIF DEVELOPMENT PACKAGE VIEW
022_WATER HARVESTING / IMPLEMENTATION_L-09.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW