Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Expired
Type:
Development Package
Apply Date:
02/25/2016
Applicant:
Description:
TENTATIVE PLAT/FLD - RANCHO REINA LOTS 1-25

Outstanding Inspections

Permit Status: Expired
Permit Number: DP16-0035
Permite Description: TENTATIVE PLAT/FLD - RANCHO REINA LOTS 1-25
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
12/14/2016 SITE - Stormwater Setup and Controls N/A Complete (Recurring) {Activity date: 12/14/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NOTES ON DP16-0134}
10/27/2022 PDSD Site/Engineering Division - Landscaping N/A Not Ready
10/27/2022 ENGR Engineering Final N/A Not Ready
10/26/2022 SITE - Stormwater Follow-up N/A Not Ready
10/27/2022 ENGR Grading Final N/A Not Ready
10/26/2022 SITE - Stormwater Final Inspection N/A Not Ready
10/27/2022 COT - ENGR - Signage Final N/A Not Ready

Completed Inspections

Permit Status: Expired
Permit Number: DP16-0035
Permit Description: TENTATIVE PLAT/FLD - RANCHO REINA LOTS 1-25
Total Completed Inspections - 8
Date Description Inspector Results Comments
12/14/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 12/14/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 12/13/2016; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET INSTALLS OF SWPPP CONTROLS AND PROVIDE NOI.}
09/27/2023 PDSD Site/Engineering Division - Landscaping Passed
09/27/2023 PDSD Site/Engineering Division - NPPO Passed
09/27/2023 ENGR Engineering Final Passed
09/27/2023 SITE - Stormwater Follow-up Passed
09/27/2023 ENGR Grading Final Passed
09/27/2023 SITE - Stormwater Final Inspection Passed
09/27/2023 COT - ENGR - Signage Final Passed

Documents

File Name Document Type  
001_COVER SHEET_C1 OF 12.TIF DEVELOPMENT PACKAGE VIEW
002_CONSTRUCTION NOTES / SECTIONS_C2 OF 12.TIF DEVELOPMENT PACKAGE VIEW
003_SITE_C3 OF 12.TIF DEVELOPMENT PACKAGE VIEW
004_UTILITY_C4 OF 12.TIF DEVELOPMENT PACKAGE VIEW
005_GRADING / DRAINAGE_C5 OF 12.TIF DEVELOPMENT PACKAGE VIEW
006_DETAILS_C6 OF 12.TIF DEVELOPMENT PACKAGE VIEW
007_SWPPP_C7 OF 12.TIF DEVELOPMENT PACKAGE VIEW
008_OFFSITE SEWER_C8 OF 12.TIF DEVELOPMENT PACKAGE VIEW
009_LANDSCAPE COVER_L1 OF 12.TIF DEVELOPMENT PACKAGE VIEW
010_NPPP_L2 OF 12.TIF DEVELOPMENT PACKAGE VIEW
011_NPPP_L3 OF 12.TIF DEVELOPMENT PACKAGE VIEW
012_LANDSCAPE_L4 OF 12.TIF DEVELOPMENT PACKAGE VIEW
1D_FLD SIGN IN SHEET 2.13.16 MEETING.PDF DOCUMENTS VIEW
1E_FLD MEETING SUMMARY.PDF DOCUMENTS VIEW
1F_FLD LETTER TO NEIGHBORS AND NOTARIZED CONFIRMATION OF MAILING.PDF DOCUMENTS VIEW
1G_PIMA COUNTY ASSESSOR'S PROPERTY INFORMATION.PDF DOCUMENTS VIEW
ACCEPTANCE NOTIFICATION. DOCUMENTS VIEW
ADDRESSING COMMENTS.PDF DOCUMENTS VIEW
SWG COMMENT.PDF DOCUMENTS VIEW
SWG CONTACT INFO & EXCAVATOR RESPOSIBILITY.PDF DOCUMENTS VIEW
TUCSON WATER COMMENTS DP16-0035.PDF DOCUMENTS VIEW
DP16-0035 RANCHO REINA TENTATIVE PLAT PAG 1ST REVIEW CALC.PDF DOCUMENTS VIEW
DP16-0035 RANCHO REINA TENTATIVE PLAT PAG 1ST REVIEW.PDF DOCUMENTS VIEW
ADDRESSING DP16-0035.PDF DOCUMENTS VIEW
ADDRESSING SUMMARY DP16-0035.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
GEOTECH ENGINEERING EVALUATION.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
ARCHITECTURAL VARIATON PLAN DOCUMENTS VIEW
CHECKLIST DOCUMENTS VIEW
None DOCUMENTS VIEW
PROJECT SUBSTANTIAL COMPL. LTR 12.21.17.PDF DOCUMENTS VIEW