Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
02/22/2016
Applicant:
Lisa Bowers
Description:
PLANET FITNESS/SITE/GRADING/SWPP/TENTATIVE PLATOriginal Approval 05/19/2016 (20 pages)1st Re

Permit Reviews

Permit Number - DP16-0032
Permit Status: Complete
Permit Description: PLANET FITNESS/SITE/GRADING/SWPP/TENTATIVE PLATOriginal Approval 05/19/2016 (20 pages)1st Re
Start Date Submittal Complete Date Status  
02/22/2016 DEV PKG - OK TO SUBMIT 02/22/2016 COMPLETED Review Details
02/23/2016 TENTATIVE PLAT REVIEW 04/20/2016 COMPLETED Review Details
04/20/2016 TENTATIVE PLAT REVIEW 07/05/2016 COMPLETED Review Details
06/30/2017 REVISION - TENT PLAT & CORE RESUB 07/10/2017 COMPLETED Review Details
10/12/2017 REVISION - TENT PLAT & CORE RESUB 11/02/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0032
Permit Description: PLANET FITNESS/SITE/GRADING/SWPP/TENTATIVE PLATOriginal Approval 05/19/2016 (20 pages)1st Re
Total Completed Inspections - 10
Date Description Inspector Results Comments
07/11/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/11/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - DROPED OFF PRE-CON PACKET. WALKED SITE WITH GC WENT OVER SWPPP REPAIRS THAT NEED TO BE DONE. PROVIDE NOI AND SWPPP INFO SIGN AT GATE.}
09/06/2016 SITE - SWPPP Correction Notice Passed {Activity date: 09/06/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - TRACKOUT HAS BEEN CLEANED AT THIS TIME} ; {Activity date: 09/02/2016; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MINOR TRACK OUT NOTED AT THE SOUTHWEST CORNER OF THE SITE, AREA WILL BE RECHECKED NEXT WEEK TO ENSURE THAT THE MATERIAL HAS BEEN SWEPTED UP IN THE STREETS.}
10/06/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 10/06/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
05/02/2017 SITE - Stormwater Follow-up Passed {Activity date: 05/02/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 10/06/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT SWPPP REPAIRS ON NORTH SIDE OF SITE.} ; {Activity date: 09/02/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO REAL CONCERNS BUT MINOR TRACKOUT NOTED AT THE SOUTH WEST ENTRANCE FROM THE SITE.} ; {Activity date: 08/30/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - ADD TRACK OUT ROCK AND MAKE REPAIRS TO SWPP CONTROLS.} ; {Activity date: 08/17/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/02/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 07/22/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - SWPPP INFO SIGN HAS BEEN INSTALLED IHAVE NOI.} ; {Activity date: 07/21/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} ; {Activity date: 07/12/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT .}
05/02/2017 COT - ENGR - Signage Final Passed {Activity date: 05/02/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
07/26/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 07/26/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 05/09/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 12/28/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
07/26/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 07/26/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
07/26/2017 ENGR Grading Final Passed {Activity date: 07/26/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
07/26/2017 SITE - Stormwater Final Inspection Passed {Activity date: 07/26/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 05/09/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
11/03/2017 ENGR Engineering Final Passed {Activity date: 11/03/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 06/16/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GC NOT ON SITE.} ; {Activity date: 05/24/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CHANGE TO SITE.} ; {Activity date: 05/09/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NOTES ON ACTIVITY #T16CM03368.}