Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP16-0032
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/02/2016 | ENGR Grading Final | DROBERTS | Partial Approval | Entered by DROBERT5 - SE CORNER BASIN APPR, NE CORNER BASIN APPR, NW CATCH BASIN PARTIAL APPROVAL |
05/02/2017 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
03/06/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO CHANGE FROM LAST INSPECTION. |
02/27/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONSTRUCTION ACITIVIY ON SITE. |
02/06/2017 | ENGR Grading Final | RLEDONN1 | Continued | Entered by RLEDONN1 - NO WORK OUT SIDE OF BUILDING. |
02/03/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO WORK ON OUT SIDE OF BUILDING. |
01/27/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - COMPLET ALL WORK ON AP PLANS. PROVIDE COT AP REVISIONS/ AS-BUILTS FOR ALL CHANGES TO GRADING AND DRAINAGE AP PLANS. |
01/26/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - STOPED BY MET WITH GC ABOUT COMPLETING ALL WORK ON AP PLANS. |
01/11/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH WENT OVER WORK TO COMPLET AND REPAIR. |
01/09/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH GC WENT OVER WORK TO COMPLET AND REPAIR. |
01/06/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - REBAR FOR SOUTH OF BUILDING DRIVE WAY OK. |
01/04/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH GC THEY ARE WORKING ON REPAIRING SIDE WALKS AND RAMPS. |
08/31/2016 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - INSPECTION PER HIGH LIGHTS ON PAGE G-2. |
08/30/2016 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - INSPECTION PER HIGH LIGHTS ON PAGE G-2. |
07/26/2017 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
07/26/2017 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
06/07/2017 | ENGR Grading Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - NO CHANGE FROM LAST MEETING WITH GC TO SITE. |
01/17/2017 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - |
07/08/2016 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC SITE PLANS ON SITE NO NOI ON SITE. |
12/12/2016 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
12/06/2016 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - FOOTER AND MAT REBAR INSIDE TRASH ENCLOUSER ONLY. |
12/01/2016 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT TRASH ENCLOSUER. |
09/10/2016 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - I LOOKED AT THIS SITE AND INSPECTED THE CATCH BASINS SO THAT THEY CAN BE POURED AT THE FOLLOWING LOCATIONS: THE BASINS LOCATED AT THE SOUTHEAST AND AT THE NORTHEAST CAN BE POURED AT THIS TIME. 12:00 THE CATCH BASIN LOCATED AT THE NORTHWEST CORNER CAN BE POUR UP THROUGH THE FIRST LIFT AT THIS TIME, THE REMAINDER TO BE POURED AT A LATER DATE. |