Permit Details

Status:
Complete
Type:
Development Package
Address:
3760 N ORACLE RD
Apply Date:
11/02/2015
Applicant:
Description:
SITE-DISCOUNT TIRE

Permit Reviews

Permit Number - DP15-0192
Permit Status: Complete
Permit Description: SITE-DISCOUNT TIRE
Start Date Submittal Complete Date Status  
03/17/2016 RESUB - SITE/GRADING ALL 04/29/2016 COMPLETED Review Details
04/29/2016 RESUB - SITE and/or GRADING 11/10/2016 COMPLETED Review Details
11/02/2015 DEV PKG - OK TO SUBMIT 11/02/2015 COMPLETED Review Details
11/02/2015 SITE and/or GRADING 03/17/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0192
Permit Description: SITE-DISCOUNT TIRE
Total Completed Inspections - 6
Date Description Inspector Results Comments
04/11/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 04/11/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE THEREFORE NO SWPPP OR STORM WATER PERMIT IS REQUIRED.
2) SWEEP UP ANY TRACKED SOIL OFF OF ADJACENT ROADWAYS AS NEEDED
3) ENSURE PHYSICAL SEPARATION OF CONSTRUCTION TO THE PUBLIC DURING CONSTRUCTION AT ALL TIMES
4) CALL FOR INSPECTION FOR ANY SITE/GRADING/LANDSCAPING CONCERNS OR CHANGES
5) CALL FOR INSPECTION FOR ANY UNDERGROUND SITE WORK PRIOR TO COVER}
04/20/2017 PDSD Site/Engineering Division - NPPO Passed {Activity date: 04/20/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NOT APPLICABLE}
10/27/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/27/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
10/27/2017 ENGR Engineering Final Passed {Activity date: 10/27/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
10/27/2017 ENGR Grading Final Passed {Activity date: 10/27/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 05/18/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE THE SITE AS SHOWN ON THE APPROVED PLANS} ; {Activity date: 04/11/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE THEREFORE NO SWPPP OR STORM WATER PERMIT IS REQUIRED.
2) SWEEP UP ANY TRACKED SOIL OFF OF ADJACENT ROADWAYS AS NEEDED
3) ENSURE PHYSICAL SEPARATION OF CONSTRUCTION TO THE PUBLIC DURING CONSTRUCTION AT ALL TIMES
4) CALL FOR INSPECTION FOR ANY SITE/GRADING/LANDSCAPING CONCERNS OR CHANGES
5) CALL FOR INSPECTION FOR ANY UNDERGROUND SITE WORK PRIO TO COVER} ; {Activity date: 04/26/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PROGRESS CHECK} ; {Activity date: 04/20/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PROGRESS CHECK, ENSURE SIDEWALK SLOPE MEET STDS. ENSURE HC ACCESS AND PARKING ARE IN COMPLIANCE}
10/27/2017 COT - ENGR - Signage Final Passed {Activity date: 10/27/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_COVER SHEET_CV1.TIF DEVELOPMENT PACKAGE VIEW
002_DEMOLITION_DM1.TIF DEVELOPMENT PACKAGE VIEW
003_SITE_SP1.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING / HORIZONTAL CONTROL_GD1.TIF DEVELOPMENT PACKAGE VIEW
005_UTILITY_UT1.TIF DEVELOPMENT PACKAGE VIEW
006_DETAILS_DT1.TIF DEVELOPMENT PACKAGE VIEW
007_DETAILS_DT2.TIF DEVELOPMENT PACKAGE VIEW
008_PLANTING_LS1.TIF DEVELOPMENT PACKAGE VIEW
009_PLANTING DETAILS_LS2.TIF DEVELOPMENT PACKAGE VIEW
010_IRRIGATION_LS3.TIF DEVELOPMENT PACKAGE VIEW
011_IRRIGATION DETAILS_LS4.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW