Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 04/11/2017 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE THEREFORE NO SWPPP OR STORM WATER PERMIT IS REQUIRED.
2) SWEEP UP ANY TRACKED SOIL OFF OF ADJACENT ROADWAYS AS NEEDED
3) ENSURE PHYSICAL SEPARATION OF CONSTRUCTION TO THE PUBLIC DURING CONSTRUCTION AT ALL TIMES
4) CALL FOR INSPECTION FOR ANY SITE/GRADING/LANDSCAPING CONCERNS OR CHANGES
5) CALL FOR INSPECTION FOR ANY UNDERGROUND SITE WORK PRIOR TO COVER |