Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP15-0192
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/11/2017 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Approved | Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE THEREFORE NO SWPPP OR STORM WATER PERMIT IS REQUIRED. 2) SWEEP UP ANY TRACKED SOIL OFF OF ADJACENT ROADWAYS AS NEEDED 3) ENSURE PHYSICAL SEPARATION OF CONSTRUCTION TO THE PUBLIC DURING CONSTRUCTION AT ALL TIMES 4) CALL FOR INSPECTION FOR ANY SITE/GRADING/LANDSCAPING CONCERNS OR CHANGES 5) CALL FOR INSPECTION FOR ANY UNDERGROUND SITE WORK PRIOR TO COVER |