Permit: DP15-0145
Permit Details
Apply Date:
08/31/2015
Applicant:
N/A
Description:
(T15DV02048) SITE/GRADING/SWPPP
Contractors:
- EAGLE ROCK EXCAVATING L L C
Permit Reviews
Permit Number - DP15-0145
Permit Status: Withdrwn
Permit Description: (T15DV02048) SITE/GRADING/SWPPP
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/24/2016 | RESUB - SITE and/or GRADING | 06/20/2016 | COMPLETED |
| 06/20/2016 | RESUB - SITE and/or GRADING | 06/21/2016 | COMPLETED |
| 06/21/2016 | RESUB - SITE and/or GRADING | 07/07/2016 | COMPLETED |
| 08/08/2018 | REVISION - SITE | 08/10/2018 | COMPLETED |
| 08/31/2015 | DEV PKG - OK TO SUBMIT | 08/31/2015 | COMPLETED |
| 08/31/2015 | SITE and/or GRADING | 05/24/2016 | COMPLETED |
Outstanding Inspections
Permit Status: Withdrwn
Permit Number: DP15-0145
Permite Description: (T15DV02048) SITE/GRADING/SWPPP
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| LANDSCAPE INSPECTION | N/A | Not Inspected | ||
| GRADING - TIER REV | N/A | Not Inspected | ||
| 03/06/2019 | LANDSCAPE - FINAL | N/A | Continued | NO ACTIVITY ON SITE. |
| 11/01/2018 | GRADING - FINAL | N/A | Continued | NO CHANGES FROM LAST INSPECTION. |
| 11/30/2018 | GRADING - CHECK FOR ACTIVITY | N/A | Continued | NO CHANGES TO SITE. |
| 12/10/2018 | ENGINEERING - FINAL | N/A | Continued | NO CHANGE FROM LAST INSPECTION. |
Completed Inspections
Permit Status: Withdrwn
Permit Number: DP15-0145
Permit Description: (T15DV02048) SITE/GRADING/SWPPP
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2016 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP 2) POSTA A SIGNED COPY OF YOUR NOI 3) INSTALL A STBILIZED CONSTRUCTION ENTRANCE 4) INSTALL A CONCRETE WASH OUT 5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP 6) SET ASIDE MATIVE PLANTS PER APPROVED PLAN 7) CALL FOR ANY SITE/GRADING CHANGES OR CONCERNS |
| 11/18/2016 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | 1) ENSURE A CONCRETE WASH OUT IS INSTALLED WHEN APPLICABLE 2) ENSURE YOU PERFORM AND DOCUMENT YOUR STORM WATER SELF INSPECTIOONS PER YOUR SWPPP 3) SWEEP UP TRACKED SOIL OFF OF ADJACENT PUBLIC ROADWAYS AS NEEDED 4) ALL BARREL CACTUS IDENTIFIED IN YOUR NPPO (19) PLAN WILL BE TRANSPLANTED TO A SET-A-SIDE PORTION OF THE DEVELOPMENT 5) CALL FOR INSPECTION TO COVERING ANY UNDERGROUND STORM PIPE/STRUCTURES 6) ENSURE CITY OF TUCSON AND THE ENGINEER OF RECORD APPROVAL FOR SITE CHANGES |
| 12/07/2016 | GRADING - INTERMEDIATE | MRUSSO | Approved | NO SITE/GRADING CONCERNS AT THIS TIME |
| 12/07/2016 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED |
| 10/15/2018 | GRADING - REBAR | RLEDONNE | Approved | |
| 10/15/2018 | NPPO - FINAL | RLEDONNE | Approved | |
| 10/15/2018 | SIGN - FINAL | RLEDONNE | Approved | |
| 10/15/2018 | STORMWATER FINAL INSPECTION | RLEDONNE | Approved |