Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
Permit Number - DP15-0145
Inspection Description - STORMWATER INSTALL OF CONTROLS
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2016 | STORMWATER INSTALL OF CONTROLS | Approved | 1) ENSURE A CONCRETE WASH OUT IS INSTALLED WHEN APPLICABLE 2) ENSURE YOU PERFORM AND DOCUMENT YOUR STORM WATER SELF INSPECTIOONS PER YOUR SWPPP 3) SWEEP UP TRACKED SOIL OFF OF ADJACENT PUBLIC ROADWAYS AS NEEDED 4) ALL BARREL CACTUS IDENTIFIED IN YOUR NPPO (19) PLAN WILL BE TRANSPLANTED TO A SET-A-SIDE PORTION OF THE DEVELOPMENT 5) CALL FOR INSPECTION TO COVERING ANY UNDERGROUND STORM PIPE/STRUCTURES 6) ENSURE CITY OF TUCSON AND THE ENGINEER OF RECORD APPROVAL FOR SITE CHANGES |