Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
08/17/2015
Applicant:
Lisa Bowers
Description:
SITE/GRADING/SWPPP - TUCSON MARKETPLACE PHASE 4, THEATRE AND ANCHOR 3.Originally approved 11/25

Permit Reviews

Permit Number - DP15-0138
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - TUCSON MARKETPLACE PHASE 4, THEATRE AND ANCHOR 3.Originally approved 11/25
Start Date Submittal Complete Date Status  
01/15/2016 DEV PKG - REVISION 02/09/2016 COMPLETED Review Details
03/03/2017 DEV PKG - REVISION 03/13/2017 COMPLETED Review Details
03/13/2017 DEV PKG - REVISION 03/17/2017 ACTIVE Review Details
08/17/2015 DEV PKG - OK TO SUBMIT 08/17/2015 COMPLETED Review Details
08/17/2015 DEV PKG 10/14/2015 COMPLETED Review Details
10/14/2015 DEV PKG - RESUBMITTAL 11/25/2015 COMPLETED Review Details
11/25/2015 DEV PKG - RESUBMITTAL 12/02/2015 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP15-0138
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - TUCSON MARKETPLACE PHASE 4, THEATRE AND ANCHOR 3.Originally approved 11/25
Total Outstanding Activity Conditions - 1
Date Name
11/25/2015 The following 5 conditions of the grading permit DP15-0138 apply:1) SWPPP report shall be provided by EOR to Contractor and shall match approved singular copy provided in final submittal, marked 'COT copy'. 2) Call for inspections including Pre-construction meeting for inspecting interim SWPP control installation.3) SWPPP, approved plans, and permit shall be kept onsite during construction until the final grading approval is provided and all interim SWPP controls are removed from the site and permanent controls in form of vegetation or sized gravel (or approved alternate soil stabilizer in areas of future development) have been installed and accepted by the City Inspector.4) As-builts shall show at minimum the constructed elevations of FFE's, inverts of inlets/outlets and other significant constructed drainage infrastructure, as well as any areas of change or as deemed necessary by RLS or EOR.5) As-built plans with letter of drainage infrastructure completion and project substantial completion shall be submitted prior to final grading inspection.

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0138
Permit Description: SITE/GRADING/SWPPP - TUCSON MARKETPLACE PHASE 4, THEATRE AND ANCHOR 3.Originally approved 11/25
Total Completed Inspections - 10
Date Description Inspector Results Comments
11/28/2016 PDSD Site/Engineering Division - NPPO Passed {Activity date: 11/28/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
11/28/2016 COT - ENGR - Signage Final Passed {Activity date: 11/28/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/04/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/04/2017 SITE - Stormwater Follow-up Passed {Activity date: 04/25/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS SITE.} ; {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/14/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, NO TRACK OUT ON SITE FROM THE RECENT RAINS.} ; {Activity date: 08/02/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 07/21/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 07/06/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 06/01/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 05/25/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 05/03/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 04/04/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GRADING CONCTACTIR ABOUT TRACK OUT .} ; {Activity date: 03/29/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 03/23/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 03/01/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 01/08/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/14/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/09/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PICKED UP NOI AND PRE-CON PACKET.}
01/04/2017 ENGR Grading Final Passed {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/04/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/04/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/17/2017 ENGR Engineering Final Passed {Activity date: 01/17/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 01/05/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET ALL WORK ON PAGE SP-6.} ; {Activity date: 01/04/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/17/2017 SITE - Stormwater Final Inspection Passed {Activity date: 01/17/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
07/01/2017 RSBU - Building Final Passed {Activity date: 07/01/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }