Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP15-0138
Permit Details
Apply Date:
08/17/2015
Applicant:
Lisa Bowers
Description:
SITE/GRADING/SWPPP - TUCSON MARKETPLACE PHASE 4, THEATRE AND ANCHOR 3.Originally approved 11/25
Permit Reviews
Permit Number - DP15-0138
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - TUCSON MARKETPLACE PHASE 4, THEATRE AND ANCHOR 3.Originally approved 11/25
Start Date | Submittal | Complete Date | Status | |
---|---|---|---|---|
08/17/2015 | DEV PKG - OK TO SUBMIT | 08/17/2015 | COMPLETED | Review Details |
08/17/2015 | DEV PKG | 10/14/2015 | COMPLETED | Review Details |
10/14/2015 | DEV PKG - RESUBMITTAL | 11/25/2015 | COMPLETED | Review Details |
11/25/2015 | DEV PKG - RESUBMITTAL | 12/02/2015 | COMPLETED | Review Details |
01/15/2016 | DEV PKG - REVISION | 02/09/2016 | COMPLETED | Review Details |
03/03/2017 | DEV PKG - REVISION | 03/13/2017 | COMPLETED | Review Details |
03/13/2017 | DEV PKG - REVISION | 03/17/2017 | ACTIVE | Review Details |
Showing 1 to 7 of 7 entries
Outstanding Activity Conditions
Permit Number - DP15-0138
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - TUCSON MARKETPLACE PHASE 4, THEATRE AND ANCHOR 3.Originally approved 11/25
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
11/25/2015 | The following 5 conditions of the grading permit DP15-0138 apply:1) SWPPP report shall be provided by EOR to Contractor and shall match approved singular copy provided in final submittal, marked 'COT copy'. 2) Call for inspections including Pre-construction meeting for inspecting interim SWPP control installation.3) SWPPP, approved plans, and permit shall be kept onsite during construction until the final grading approval is provided and all interim SWPP controls are removed from the site and permanent controls in form of vegetation or sized gravel (or approved alternate soil stabilizer in areas of future development) have been installed and accepted by the City Inspector.4) As-builts shall show at minimum the constructed elevations of FFE's, inverts of inlets/outlets and other significant constructed drainage infrastructure, as well as any areas of change or as deemed necessary by RLS or EOR.5) As-built plans with letter of drainage infrastructure completion and project substantial completion shall be submitted prior to final grading inspection. |
Showing 1 to 1 of 1 entries
Completed Inspections
Permit Status: Complete
Permit Number: DP15-0138
Permit Description: SITE/GRADING/SWPPP - TUCSON MARKETPLACE PHASE 4, THEATRE AND ANCHOR 3.Originally approved 11/25
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/01/2017 | RSBU - Building Final | Passed | {Activity date: 07/01/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
01/17/2017 | ENGR Engineering Final | Passed | {Activity date: 01/17/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 01/05/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET ALL WORK ON PAGE SP-6.} ; {Activity date: 01/04/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
01/17/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 01/17/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
01/04/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
01/04/2017 | SITE - Stormwater Follow-up | Passed | {Activity date: 04/25/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS SITE.} ; {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/14/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, NO TRACK OUT ON SITE FROM THE RECENT RAINS.} ; {Activity date: 08/02/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 07/21/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 07/06/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 06/01/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 05/25/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 05/03/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 04/04/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GRADING CONCTACTIR ABOUT TRACK OUT .} ; {Activity date: 03/29/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 03/23/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 03/01/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 01/08/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/14/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/09/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PICKED UP NOI AND PRE-CON PACKET.} | |
01/04/2017 | ENGR Grading Final | Passed | {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
01/04/2017 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
01/04/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
11/28/2016 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 11/28/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
11/28/2016 | COT - ENGR - Signage Final | Passed | {Activity date: 11/28/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } |
Showing 1 to 10 of 10 entries
Documents
File Name | Document Type | |
None | LETTER OF COMPLETION | VIEW |
001_COVER SHEET_DP-1.TIF | DEVELOPMENT PACKAGE | VIEW |
002_NOTES SHEET_DP-2.TIF | DEVELOPMENT PACKAGE | VIEW |
003_OVERALL SITE / KEY MAP_DP-3.TIF | DEVELOPMENT PACKAGE | VIEW |
004_SITE_SP-1.TIF | DEVELOPMENT PACKAGE | VIEW |
005_SITE_SP-2.TIF | DEVELOPMENT PACKAGE | VIEW |
006_SITE_SP-3.TIF | DEVELOPMENT PACKAGE | VIEW |
007_SITE_SP-4.TIF | DEVELOPMENT PACKAGE | VIEW |
008_SITE_SP-5.TIF | DEVELOPMENT PACKAGE | VIEW |
009_SITE_SP-6.TIF | DEVELOPMENT PACKAGE | VIEW |
010_GRADING / DRAINAGE NOTES / SECTIONS_G-1.TIF | DEVELOPMENT PACKAGE | VIEW |
011_GRADING / DRAINAGE_G-2.TIF | DEVELOPMENT PACKAGE | VIEW |
012_GRADING / DRAINAGE_G-3.TIF | DEVELOPMENT PACKAGE | VIEW |
013_GRADING / DRAINAGE_G-4.TIF | DEVELOPMENT PACKAGE | VIEW |
014_GRADING / DRAINAGE_G-5.TIF | DEVELOPMENT PACKAGE | VIEW |
015_GRADING / DRAINAGE_G-6.TIF | DEVELOPMENT PACKAGE | VIEW |
016_GRADING / DRAINAGE_G-7.TIF | DEVELOPMENT PACKAGE | VIEW |
017_DETAILS_DTL-1.TIF | DEVELOPMENT PACKAGE | VIEW |
018_DETAILS_DTL-2.TIF | DEVELOPMENT PACKAGE | VIEW |
019_DETAILS_DTL-3.TIF | DEVELOPMENT PACKAGE | VIEW |
020_DETAILS_DTL-4.TIF | DEVELOPMENT PACKAGE | VIEW |
021_STORMWATER MANAGEMENT NOTES_SWMP-1.TIF | DEVELOPMENT PACKAGE | VIEW |
022_STORMWATER MANAGEMENT PLAN_SWMP-2.TIF | DEVELOPMENT PACKAGE | VIEW |
023_PRIVATE UTILITY NOTES / DETAILS_U-1.TIF | DEVELOPMENT PACKAGE | VIEW |
024_PRIVATE UTILITY_U-2.TIF | DEVELOPMENT PACKAGE | VIEW |
025_LANDSCAPE COVER SHEET_L1.0.TIF | DEVELOPMENT PACKAGE | VIEW |
026_LANDSCAPE SHEET_L1.1.TIF | DEVELOPMENT PACKAGE | VIEW |
027_LANDSCAPE SHEET_L1.2.TIF | DEVELOPMENT PACKAGE | VIEW |
028_LANDSCAPE SHEET_L1.3.TIF | DEVELOPMENT PACKAGE | VIEW |
029_LANDSCAPE SHEET_L.1.4.TIF | DEVELOPMENT PACKAGE | VIEW |
030_LANDSCAPE SHEET_L1.5.TIF | DEVELOPMENT PACKAGE | VIEW |
031_LANDSCAPE SHEET_L1.6.TIF | DEVELOPMENT PACKAGE | VIEW |
032_IRRIGATION COVER SHEET_L2.0.TIF | DEVELOPMENT PACKAGE | VIEW |
033_IRRIGATION SHEET_L2.1.TIF | DEVELOPMENT PACKAGE | VIEW |
034_IRRIGATION SHEET_L2.2.TIF | DEVELOPMENT PACKAGE | VIEW |
035_IRRIGATION SHEET_L2.3.TIF | DEVELOPMENT PACKAGE | VIEW |
036_IRRIGATION SHEET_L2.4.TIF | DEVELOPMENT PACKAGE | VIEW |
037_IRRIGATION SHEET_L2.5.TIF | DEVELOPMENT PACKAGE | VIEW |
038_IRRIGATION SHEET_L2.6.TIF | DEVELOPMENT PACKAGE | VIEW |
039_LANDSCAPE DETAILS_L3.0.TIF | DEVELOPMENT PACKAGE | VIEW |
040_IRRIGATION DETAILS_L3.1.TIF | DEVELOPMENT PACKAGE | VIEW |
SWG REVIEW OF TUCSON MARKET PLC PHASE 4 DP15-0138 .PDF | DOCUMENTS | VIEW |
2015-05 SWG TUCSON DISTRICT CONTACT INFO-MAP-STANDBY.PDF | DOCUMENTS | VIEW |
TW DP15-0138.PDF | DOCUMENTS | VIEW |
TMP4 AD-HOC 1.PDF | DOCUMENTS | VIEW |
TMP4 AD-HOC 2.PDF | DOCUMENTS | VIEW |
PAG DP15-0138 TUCSON MARKETPLACE PHASE 4.PDF | DOCUMENTS | VIEW |
PAG DP15-0138 TUCSON MARKETPLACE PHASE 4 CALC.PDF | DOCUMENTS | VIEW |
None | DOCUMENTS | VIEW |
RWRD COMMENTS.PDF | DOCUMENTS | VIEW |
None | DOCUMENTS | VIEW |