Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
08/17/2015
Applicant:
Lisa Bowers
Description:
SITE/GRADING/SWPPP - TUCSON MARKETPLACE PHASE 4, THEATRE AND ANCHOR 3.Originally approved 11/25

Permit Reviews

Permit Number - DP15-0138
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - TUCSON MARKETPLACE PHASE 4, THEATRE AND ANCHOR 3.Originally approved 11/25
Start Date Submittal Complete Date Status  
01/15/2016 DEV PKG - REVISION 02/09/2016 COMPLETED Review Details
03/03/2017 DEV PKG - REVISION 03/13/2017 COMPLETED Review Details
03/13/2017 DEV PKG - REVISION 03/17/2017 ACTIVE Review Details
08/17/2015 DEV PKG - OK TO SUBMIT 08/17/2015 COMPLETED Review Details
08/17/2015 DEV PKG 10/14/2015 COMPLETED Review Details
10/14/2015 DEV PKG - RESUBMITTAL 11/25/2015 COMPLETED Review Details
11/25/2015 DEV PKG - RESUBMITTAL 12/02/2015 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP15-0138
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - TUCSON MARKETPLACE PHASE 4, THEATRE AND ANCHOR 3.Originally approved 11/25
Total Outstanding Activity Conditions - 1
Date Name
11/25/2015 The following 5 conditions of the grading permit DP15-0138 apply:1) SWPPP report shall be provided by EOR to Contractor and shall match approved singular copy provided in final submittal, marked 'COT copy'. 2) Call for inspections including Pre-construction meeting for inspecting interim SWPP control installation.3) SWPPP, approved plans, and permit shall be kept onsite during construction until the final grading approval is provided and all interim SWPP controls are removed from the site and permanent controls in form of vegetation or sized gravel (or approved alternate soil stabilizer in areas of future development) have been installed and accepted by the City Inspector.4) As-builts shall show at minimum the constructed elevations of FFE's, inverts of inlets/outlets and other significant constructed drainage infrastructure, as well as any areas of change or as deemed necessary by RLS or EOR.5) As-built plans with letter of drainage infrastructure completion and project substantial completion shall be submitted prior to final grading inspection.

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0138
Permit Description: SITE/GRADING/SWPPP - TUCSON MARKETPLACE PHASE 4, THEATRE AND ANCHOR 3.Originally approved 11/25
Total Completed Inspections - 10
Date Description Inspector Results Comments
11/28/2016 PDSD Site/Engineering Division - NPPO Passed {Activity date: 11/28/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
11/28/2016 COT - ENGR - Signage Final Passed {Activity date: 11/28/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/04/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/04/2017 SITE - Stormwater Follow-up Passed {Activity date: 04/25/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS SITE.} ; {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/14/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, NO TRACK OUT ON SITE FROM THE RECENT RAINS.} ; {Activity date: 08/02/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 07/21/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 07/06/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 06/01/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 05/25/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 05/03/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 04/04/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GRADING CONCTACTIR ABOUT TRACK OUT .} ; {Activity date: 03/29/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 03/23/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 03/01/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS.} ; {Activity date: 01/08/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/14/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/09/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PICKED UP NOI AND PRE-CON PACKET.}
01/04/2017 ENGR Grading Final Passed {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/04/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/04/2017 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/17/2017 ENGR Engineering Final Passed {Activity date: 01/17/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 01/05/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET ALL WORK ON PAGE SP-6.} ; {Activity date: 01/04/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/17/2017 SITE - Stormwater Final Inspection Passed {Activity date: 01/17/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
07/01/2017 RSBU - Building Final Passed {Activity date: 07/01/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
None LETTER OF COMPLETION VIEW
001_COVER SHEET_DP-1.TIF DEVELOPMENT PACKAGE VIEW
002_NOTES SHEET_DP-2.TIF DEVELOPMENT PACKAGE VIEW
003_OVERALL SITE / KEY MAP_DP-3.TIF DEVELOPMENT PACKAGE VIEW
004_SITE_SP-1.TIF DEVELOPMENT PACKAGE VIEW
005_SITE_SP-2.TIF DEVELOPMENT PACKAGE VIEW
006_SITE_SP-3.TIF DEVELOPMENT PACKAGE VIEW
007_SITE_SP-4.TIF DEVELOPMENT PACKAGE VIEW
008_SITE_SP-5.TIF DEVELOPMENT PACKAGE VIEW
009_SITE_SP-6.TIF DEVELOPMENT PACKAGE VIEW
010_GRADING / DRAINAGE NOTES / SECTIONS_G-1.TIF DEVELOPMENT PACKAGE VIEW
011_GRADING / DRAINAGE_G-2.TIF DEVELOPMENT PACKAGE VIEW
012_GRADING / DRAINAGE_G-3.TIF DEVELOPMENT PACKAGE VIEW
013_GRADING / DRAINAGE_G-4.TIF DEVELOPMENT PACKAGE VIEW
014_GRADING / DRAINAGE_G-5.TIF DEVELOPMENT PACKAGE VIEW
015_GRADING / DRAINAGE_G-6.TIF DEVELOPMENT PACKAGE VIEW
016_GRADING / DRAINAGE_G-7.TIF DEVELOPMENT PACKAGE VIEW
017_DETAILS_DTL-1.TIF DEVELOPMENT PACKAGE VIEW
018_DETAILS_DTL-2.TIF DEVELOPMENT PACKAGE VIEW
019_DETAILS_DTL-3.TIF DEVELOPMENT PACKAGE VIEW
020_DETAILS_DTL-4.TIF DEVELOPMENT PACKAGE VIEW
021_STORMWATER MANAGEMENT NOTES_SWMP-1.TIF DEVELOPMENT PACKAGE VIEW
022_STORMWATER MANAGEMENT PLAN_SWMP-2.TIF DEVELOPMENT PACKAGE VIEW
023_PRIVATE UTILITY NOTES / DETAILS_U-1.TIF DEVELOPMENT PACKAGE VIEW
024_PRIVATE UTILITY_U-2.TIF DEVELOPMENT PACKAGE VIEW
025_LANDSCAPE COVER SHEET_L1.0.TIF DEVELOPMENT PACKAGE VIEW
026_LANDSCAPE SHEET_L1.1.TIF DEVELOPMENT PACKAGE VIEW
027_LANDSCAPE SHEET_L1.2.TIF DEVELOPMENT PACKAGE VIEW
028_LANDSCAPE SHEET_L1.3.TIF DEVELOPMENT PACKAGE VIEW
029_LANDSCAPE SHEET_L.1.4.TIF DEVELOPMENT PACKAGE VIEW
030_LANDSCAPE SHEET_L1.5.TIF DEVELOPMENT PACKAGE VIEW
031_LANDSCAPE SHEET_L1.6.TIF DEVELOPMENT PACKAGE VIEW
032_IRRIGATION COVER SHEET_L2.0.TIF DEVELOPMENT PACKAGE VIEW
033_IRRIGATION SHEET_L2.1.TIF DEVELOPMENT PACKAGE VIEW
034_IRRIGATION SHEET_L2.2.TIF DEVELOPMENT PACKAGE VIEW
035_IRRIGATION SHEET_L2.3.TIF DEVELOPMENT PACKAGE VIEW
036_IRRIGATION SHEET_L2.4.TIF DEVELOPMENT PACKAGE VIEW
037_IRRIGATION SHEET_L2.5.TIF DEVELOPMENT PACKAGE VIEW
038_IRRIGATION SHEET_L2.6.TIF DEVELOPMENT PACKAGE VIEW
039_LANDSCAPE DETAILS_L3.0.TIF DEVELOPMENT PACKAGE VIEW
040_IRRIGATION DETAILS_L3.1.TIF DEVELOPMENT PACKAGE VIEW
SWG REVIEW OF TUCSON MARKET PLC PHASE 4 DP15-0138 .PDF DOCUMENTS VIEW
2015-05 SWG TUCSON DISTRICT CONTACT INFO-MAP-STANDBY.PDF DOCUMENTS VIEW
TW DP15-0138.PDF DOCUMENTS VIEW
TMP4 AD-HOC 1.PDF DOCUMENTS VIEW
TMP4 AD-HOC 2.PDF DOCUMENTS VIEW
PAG DP15-0138 TUCSON MARKETPLACE PHASE 4.PDF DOCUMENTS VIEW
PAG DP15-0138 TUCSON MARKETPLACE PHASE 4 CALC.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
RWRD COMMENTS.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW