Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
07/30/2015
Applicant:
Kevin Petrick
Description:
SITE, CIVIL, LANDSCAPE Originally approved 1/26/2016 (13 pages-page 5 is numbered incorrectly as

Permit Reviews

Permit Number - DP15-0119
Permit Status: Complete
Permit Description: SITE, CIVIL, LANDSCAPE Originally approved 1/26/2016 (13 pages-page 5 is numbered incorrectly as
Start Date Submittal Complete Date Status  
07/21/2016 DEV PKG - REVISION 08/30/2016 COMPLETED Review Details
07/30/2015 DEV PKG - OK TO SUBMIT 07/30/2015 COMPLETED Review Details
07/30/2015 SITE and/or GRADING 09/09/2015 COMPLETED Review Details
08/30/2016 DEV PKG - REVISION 08/31/2016 COMPLETED Review Details
12/08/2015 DEV PKG 01/26/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0119
Permit Description: SITE, CIVIL, LANDSCAPE Originally approved 1/26/2016 (13 pages-page 5 is numbered incorrectly as
Total Completed Inspections - 9
Date Description Inspector Results Comments
03/18/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 03/18/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) SITE IS LESS THAN 1 ACRE THEREFORE NO SWPPP IS REQUIRED.
2) HOWEVER SITE MUST KEEP DISTURBED SOIL ON SITE DURING CONSTRUCTION TO ENSURE COT COMPLIANCE W/THE CITYS STORM WATER PERMIT
3) CALL FOR INSPECTION FOR RE-BAR LAYOUT FOR FOR TRASH ENCLOSURE FOOTINGS
4) CALL FOR ANY CHANGES OR SITE CONCERNS}
08/09/2016 COT - ENGR - Signage Final Passed {Activity date: 08/09/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
08/15/2016 PDSD Site/Engineering Division - NPPO Passed {Activity date: 08/15/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - }
08/15/2016 SITE - Stormwater Follow-up Passed {Activity date: 08/15/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } ; {Activity date: 07/21/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/07/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/06/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 04/05/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAY} ; {Activity date: 04/01/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/24/2016; Status: Continued; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - 1) NO SWPPP REQUIRED, NO TRACKING AT SITE
2) FOOTINGS FOR BLDG BEING INSTALLED, CONTRACTOR INSTALLING UTILITIES.}
08/15/2016 SITE - Stormwater Final Inspection Passed {Activity date: 08/15/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - }
08/15/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 08/15/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - }
09/16/2016 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 09/16/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/09/2016; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CURRENTLY THE LANDSCAPE CREWS ARE PLANTING THE TREES AND SHRUBS FOR THIS SITE AND WILL BE INSPECTED AT A LATER DATE.}
09/16/2016 ENGR Grading Final Passed {Activity date: 09/16/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/09/2016; Status: Correction Required; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE ASPHALT PAVEMENT SHOWN ON THE APPROVED PLANS HAS BEEN DELETED AND REPLACED WITH CONCRETE PAVEMENT. THIS CHANGE WILL NEED TO BE SUBMITED AND APPROVED AS A REVISION PRIOR TO THE FINAL APPROVAL OF THE SITE.}
05/22/2019 ENGR Engineering Final Passed {Activity date: 05/22/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/16/2016; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - CONTACTED KEVIN AND ADVISED HIM THAT ALL I AM WAITING FOR TO CLOSE OUT THIS DEVELOPMENT PACKAGE IS FOR HIS CERTIFICATION LETTER.} ; {Activity date: 09/06/2016; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE INSPECTION CANCELLED BY MARK ANDERSON, IT WILL BE SCHEDULED AT A LATER DATE.} ; {Activity date: 08/12/2016; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/16/2016; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH MARK AND THE CONCRETE CREW AT THE SITE TOO LOOK AT THE HANDICAP ACCESS RAMP TO SEE IF IT WAS STILL OUT OF SPEC., THEY HAVE QUESTIONED IF IT WAS MEASURED CORRECTLY. I UTILIZED A T SQUARE TO ENSURE THAT THE LEVEL WAS BEING PLACED CORRECTLY ACROSS THE RAMP AND ASKED THE CONTRACTOR TO PLACE HIS LEVEL FOR THE READINGS. IN ALL LOCATIONS THAT WERE CHECKED THE READINGS EXCEEDED THE CROSS SLOPE IN THE RANGE OF 2.2 TO 2.5 % OF CROSS SLOPE, THE MAXIMUM ALLOWED IS 2.0%, THE RAMP FAILED. I ADVISED MARK AND THE CONCRETE CREW THAT THE AREA WAS OUT OF SPECIFICATION AND WOULD HAVE TO BE REMOVED AND REPOURED NOT TOO EXCEED THE 8.33% RUNNING SLOPE AND THE 2.0% CROSS SLOPE.} ; {Activity date: 08/09/2016; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE FOLLOWING ITEMS STILL NEED TO BE ADDRESSED:
1) THE WHEELCHAIR ACCESS RAMP FOR THIS SITE DOES NOT MEET THE MAXIMUM REQUIREMENTS FOR THE SLOPES(BOTH RUNNING AND CROSS SLOPES) IT EXCEEDS THE 2% CROSS SLOPE AND THE 9.33% RUNNING SLOPE.
2) RAIN LEADERS FROM THE ROOF DEPOSIT ROOF DRAINAGE DIRECTLY ON TO A PEDESTRIAN REFUGE AREA DIRECTLY ADJACENT TO THE FRONT OF THE BUILDING.
3) THE ASPHALT PAVEMENT FOR THE SITE HAS BEEN CHANGED TO CONCRETE WHICH NEEDS TO BE APPROVED AS A REVISION FOR THIS SITE.
4) INSTALL THE PARKING LOT STRIPING AS SHOWN ON THE APPROVED PLANS.
I HAVE ADVISED THE ENGINEER OF RECORD AND THE SITE SUPERINTENDENT THAT THIS SITE WILL REQUIRE THAT REVISIONS ARE SUBMITTED AND APPROVED FOR ALL THE CHANGES THAT HAVE BEEN MADE TO THE SITE, AND WE WILL REQUIRE A CERTIFICATION LETTER FROM THE STAMPING ARCHITECT.}

Documents

File Name Document Type  
001_COVER SHEET_C.1.TIF DEVELOPMENT PACKAGE VIEW
002_DETAILS_C.2.TIF DEVELOPMENT PACKAGE VIEW
003_SITE_C.3.TIF DEVELOPMENT PACKAGE VIEW
004_HOUGHTON TOWN CENT. CALCS_C.4.TIF DEVELOPMENT PACKAGE VIEW
005_HOUGHTON RD SCENIC CORRIDOR_C.5.TIF DEVELOPMENT PACKAGE VIEW
006_COVER SHEET_C1.1.TIF DEVELOPMENT PACKAGE VIEW
007_CIVIL DETAILS_C1.2.TIF DEVELOPMENT PACKAGE VIEW
008_CIVIL PAVING_C1.3.TIF DEVELOPMENT PACKAGE VIEW
009_CIVIL GRADING_C1.4.TIF DEVELOPMENT PACKAGE VIEW
010_CIVIL UTILITY_C1.5.TIF DEVELOPMENT PACKAGE VIEW
011_LANDSCAPE / IRRIGATION_L.1.TIF DEVELOPMENT PACKAGE VIEW
012_LANDSCAPE / DETAILS_L.2.TIF DEVELOPMENT PACKAGE VIEW
013_LANDSCAPE / WATER HARVEST_L.3.TIF DEVELOPMENT PACKAGE VIEW
PAG TRIP COMMENTS.PDF DOCUMENTS VIEW
PAG CALC.PDF DOCUMENTS VIEW
SWG INFO-MAP.PDF DOCUMENTS VIEW
TEP COMMENTS.PDF DOCUMENTS VIEW
TUCSON WATER LETTER.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
SITE CERTIFICATION LETTER.PDF DOCUMENTS VIEW