Permit: DP15-0069
Permit Details
Apply Date:
04/23/2015
Applicant:
Jeffrey Stanley
Description:
DP- TUCSON BLUE
Permit Reviews
Permit Number - DP15-0069
Permit Status: Expired
Permit Description: DP- TUCSON BLUE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/23/2015 | DEV PKG - OK TO SUBMIT | 04/24/2015 | COMPLETED |
| 04/24/2015 | DEV PKG | 07/10/2015 | COMPLETED |
| 07/24/2015 | DEV PKG - RESUBMITTAL | 09/02/2015 | COMPLETED |
| 09/02/2015 | DEV PKG - RESUBMITTAL | 09/10/2015 | ACTIVE |
Outstanding Activity Conditions
Permit Number - DP15-0069
Permit Status: Expired
Permit Description: DP- TUCSON BLUE
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/04/2015 | The following 8 conditions apply to the permit:1)FOR A PDSD ENGINEERING INSPECTION, CALL IVR (740-6970), OR CONTACT PDSD ENGINEERING AT 837-4991, OR SCHEDULE INSPECTIONS ONLINE AT: HTTPS://WWW.TUCSONAZ.GOV/PDSD/SCHEDULING-INSPECTIONS2)PERMIT & PLAN SHALL BE KEPT IN READILY ACCESSIBLE LOCATION AT ALL TIMES.3)PDSD ENGINEERING INSPECTIONS ARE REQUIRED PRIOR TO FINAL INSPECTION.4)EXCEPT AS APPROVED BY THE CITY ENGINEER PRIOR TO THE START OF CONSTRUCTION, DEVELOPMENT UNDER THIS PERMIT SHALL NOT OBSTRUCT, RETARD OR DIVERT THE EXISTING FLOW OF FLOODWATERS FROM OR TO ADJACENT PROPERTIES.5)SOLID WASTE ENCLOSURE WALLS TO BE INSPECTED BY CITY OF TUCSON PDSD ENGINEERING, TO ASSURE NO STORMWATER RUNOFF IS ALLOWED TO FLOW THROUGH THE ENCLOSURE (NO OPENINGS IN ENCLOSURE WALL / STORMWATER TO FLOW AROUND). 6)ANY REVISION TO THE PLAN MAY REQUIRE A RE-SUBMITTAL OF A REVISED PLAN FOR REVIEW. CONTACT INSPECTOR AND PDSD ENGINEERING AT 791-5550 TO DISCUSS CHANGES FOR PROJECT.7)IF CONSTRUCTION IS EXPECTED TO LAST LONGER THAN THE EXPIRATION DATE OF THE PERMIT, CONTACT PDSD TO RENEW/EXTEND THE PERMIT. IF FINAL INSPECTION HAS NOT BEEN COMPLETED BEFORE THE PERMIT EXPIRES, AND THE PERMIT HAS NOT BEEN RENEWED, ADDITIONAL FEES AND REVIEWS MAY BE REQUIRED.8)THE PERMITEE SHALL NOTIFY THE PDSD WHEN THE OPERATION IS READY FOR FINAL INSPECTION. FINAL APPROVAL SHALL NOT BE GIVEN UNTIL ALL WORK, INCLUDING ESTABLISHMENT OF ALL PERMANENT EROSION CONTROL MEASURES HAVE BEEN COMPLETED IN ACCORDANCE WITH THE APPROVED NPPO PLANS, PLAN, AND PERMIT, AND ALL CONDITIONS OF PERMIT ARE COMPLETED. |