Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
3570 N CRAYCROFT RD
Apply Date:
04/21/2015
Applicant:
Description:
DEV PACKAGEOriginally approved 8/18/2015 (17 pages)1st Revision (as built) approved 7/21/2016

Permit Reviews

Permit Number - DP15-0065
Permit Status: Complete
Permit Description: DEV PACKAGEOriginally approved 8/18/2015 (17 pages)1st Revision (as built) approved 7/21/2016
Start Date Submittal Complete Date Status  
01/05/2017 DEV PKG - REVISION 01/19/2017 COMPLETED Review Details
04/21/2015 DEV PKG - OK TO SUBMIT 04/21/2015 COMPLETED Review Details
04/21/2015 DEV PKG 05/22/2015 COMPLETED Review Details
05/05/2017 DEV PKG - REVISION 05/05/2017 COMPLETED Review Details
07/02/2015 DEV PKG - RESUBMITTAL 08/05/2015 COMPLETED Review Details
07/21/2016 DEV PKG - REVISION 07/21/2016 COMPLETED Review Details
08/11/2015 DEV PKG - RESUBMITTAL 09/25/2015 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP15-0065
Permit Status: Complete
Permit Description: DEV PACKAGEOriginally approved 8/18/2015 (17 pages)1st Revision (as built) approved 7/21/2016
Total Outstanding Activity Conditions - 2
Date Name
08/12/2015 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
08/12/2015 AS BUILTS REQUIRED

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0065
Permit Description: DEV PACKAGEOriginally approved 8/18/2015 (17 pages)1st Revision (as built) approved 7/21/2016
Total Completed Inspections - 8
Date Description Inspector Results Comments
10/02/2015 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/02/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GRADING CONTRACTOR. DROPED OFF PER CON PACKET WENT OVER NPPO SWPPP CONTROLS AND TO PROVIDE NOI.}
10/07/2015 SITE - Stormwater Setup and Controls Passed {Activity date: 10/07/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
08/16/2016 SITE - Stormwater Follow-up Passed {Activity date: 08/16/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/06/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 06/17/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GRADING CONRACTOR ABOUT ADDING SWPPP CONTROLS AT SOUTH WEST SIDE OF SIDE.} ; {Activity date: 05/04/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT CLEAN UP OF SILT AND REPAIRS TO SWPPP CONTROLS.} ; {Activity date: 04/28/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - CALLED GC ABOUT SWPPP CONTROL REPAIRS.} ; {Activity date: 03/18/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT ADDING TRACK OUT ROCK.} ; {Activity date: 02/25/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 02/10/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 02/03/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - ROCK HAS NOT BEEN ADDED TO TRACK OUT AT GATE.} ; {Activity date: 01/29/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT ADDING ROCK AT GATE.} ; {Activity date: 01/28/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - REPAIRS HAVE BEEN DONE.} ; {Activity date: 01/19/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT REPAIRS TO SWPPP CONTROLS.} ; {Activity date: 01/13/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 01/08/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/29/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/22/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/15/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO ACTIVITY ON SITE . DO TO RAIN.} ; {Activity date: 12/14/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - STILL WORKING ON SWPPP COTROLS.} ; {Activity date: 12/11/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WORKING ON REPAIRING SWPPP CONTROLS.} ; {Activity date: 11/24/2015; Status: Continued; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. STILL MOVING DIRT.} ; {Activity date: 11/12/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - TRACK OUT ON CRAYCROFT. NO WASHOUT FOR CONCRETE. NEED TO CLEAN AND ADD TRACKOUT ROCK AND REPAIR SWPPP CONTROLS.} ; {Activity date: 11/04/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/30/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 10/28/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS ON TRACK OUT.} ; {Activity date: 10/27/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - STREET SWEEPER ON SITE.} ; {Activity date: 10/26/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WALKED SITE GOT WITH GC REP TO REPAIR CONTROLS .} ; {Activity date: 10/23/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - GRADING ACTIVITY ONLY.} ; {Activity date: 10/20/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - STREET SWEEPER WORKING FROM 10 AM TO 2PM.} ; {Activity date: 10/19/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT TRACK OUT ON TO CRAY CROFT AND SWPPP REP FOR GC THEY SAID THAT THE ROAD WOULD BE CLEANED WHEN TRUCKS ARE RUNNING.}
08/16/2016 SITE - Stormwater Final Inspection Passed {Activity date: 08/16/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/25/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - KNEADERS BAKERY PARKING AREA OK (ONLY).}
03/03/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 03/03/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 08/30/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/28/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
07/05/2017 COT - RSBU - Stem Wall/Retaining Wall Passed {Activity date: 07/05/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NOT REUIRED FOR THIS PERMIT}
07/05/2017 ENGR Grading Final Passed {Activity date: 07/05/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - INSPECTION DID NOT PRINT ON MONDAY 7/3/17 SO THIS SITE IS BEING CHECKED ON 7/5/17.
SITE WORK APPEARS TO BE COMPLETE AT THIS TIME WILL RESCHEDULE THE FINAL GRADING FOR TOMORROW.} ; {Activity date: 07/28/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
07/06/2017 ENGR Engineering Final Passed {Activity date: 07/06/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 03/03/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET ON SITE WENT OVER WORK TO COMPLETE.} ; {Activity date: 02/24/2017; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ON SITE WENT OVER WORK TO COMPLETE.} ; {Activity date: 11/14/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - HYDROSEED INSTALLED ON EAST SIDE OF BUILDING.TALKED TO BRIAN ABOUT EROSION ON EAST AND SOUTH SIDE OF SITE.} ; {Activity date: 11/02/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - RAMP ON NORTH EAST SIDE OF SITE NOT OVER 2%.} ; {Activity date: 10/24/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WALKED SITE WITH DAVE ROBERS AND GC AND ENGINEER. WENT OVER WORK THAT NEEDS TO BE DONE FOR FINAL.} ; {Activity date: 10/13/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - TRASH. SEED MIX. RIP-RAP.LETTER ON REPAIR TO SPILL WAY. CLEAN AND STABILIZE LOT TO SOUTH OF KNEADERS.} ; {Activity date: 10/11/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 09/13/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - LOOKED OVER THE PARKING LOTS AND THE CHANGES THAT THEY HAVE MADE TO THE PAALS. EVERTHING APPEARS TO BE UNDER 2% IN ALL THE LOCATIONS THAT I HAVE CHECKED TODAY. THE SUPERVISOR FOR THE SITE HAS CONTACTED ME AND BEEN ADVISED THAT THIS PORTION OF THE WORK APPEARS TO BE COMPLETE AND WITHIN THE TOLERANCES. THE CREWS WILL CONTINUE TO WORK ON THE REST OF THE LIST OF INCOMPLETE ITEMS. COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS} ; {Activity date: 08/30/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 08/23/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WALKED SITE WITH DAVE ROBERTS WENT OVER CROSS SLOPES OVER 2% AND RIP-RAP THAT HAS STILL NOT BEEN REPAIRED .} ; {Activity date: 08/17/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - SLOPES IN ADA PARKING AREA OK AT KNEADERS.} ; {Activity date: 08/16/2016; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/25/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - KNEADERS BAKERY PARKING ONLY.}

Documents

File Name Document Type  
001_COVER SHEET_1 OF 17.TIF DEVELOPMENT PACKAGE VIEW
002_SITE_2 OF 17.TIF DEVELOPMENT PACKAGE VIEW
003_GRADING / PAVING / UTILITY_3 OF 17.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING / PAVING / UTILITY-DETAILED SITE GRADING_4 OF 17.TIF DEVELOPMENT PACKAGE VIEW
005_GRADING / PAVING / UTILITY-SITE GRADING DETAILS_5 OF 17.TIF DEVELOPMENT PACKAGE VIEW
006_SWPPP MAP_6 OF 17.TIF DEVELOPMENT PACKAGE VIEW
007_NPP PLAN (1)_7 OF 17.TIF DEVELOPMENT PACKAGE VIEW
008_NPP PLAN (2)_8 OF 17.TIF DEVELOPMENT PACKAGE VIEW
009_RIPARIAN HABITAT MITIGATION_9 OF 17.TIF DEVELOPMENT PACKAGE VIEW
010_RIPARIAN HABITAT MITIGATION_10 OF 17.TIF DEVELOPMENT PACKAGE VIEW
011_RIPARIAN HABITAT IRRIGATION_11 OF 17.TIF DEVELOPMENT PACKAGE VIEW
012_LANDSCAPE OVERVIEW_12 OF 17.TIF DEVELOPMENT PACKAGE VIEW
013_LANDSCAPE_13 OF 17.TIF DEVELOPMENT PACKAGE VIEW
014_IRRIGATION_14 OF 17.TIF DEVELOPMENT PACKAGE VIEW
015_WATER HARVEST PLAN (1)_15 OF 17.TIF DEVELOPMENT PACKAGE VIEW
016_WATER HARVEST PLAN (2)_16 OF 17.TIF DEVELOPMENT PACKAGE VIEW
017_VIEW CORRIDOR ANALYSIS_17 OF 17.TIF DEVELOPMENT PACKAGE VIEW
SWG KNEADERS BAKERY AT RIO VERDE VILLAGE.PDF DOCUMENTS VIEW
PAG DP15-0065 KNEADERS CALC.PDF DOCUMENTS VIEW
PAG DP15-0065 KNEADERS.PDF DOCUMENTS VIEW
TEP DP15-0065.PDF DOCUMENTS VIEW
TW DP15-0065.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW