Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP15-0065
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/16/2016 | SITE - Stormwater Follow-up | RLEDONNE | Approved | Entered by RLEDONN1 - |
| 07/06/2016 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 06/17/2016 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GRADING CONRACTOR ABOUT ADDING SWPPP CONTROLS AT SOUTH WEST SIDE OF SIDE. |
| 05/04/2016 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT CLEAN UP OF SILT AND REPAIRS TO SWPPP CONTROLS. |
| 04/28/2016 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - CALLED GC ABOUT SWPPP CONTROL REPAIRS. |
| 03/18/2016 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT ADDING TRACK OUT ROCK. |
| 02/25/2016 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 02/10/2016 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 02/03/2016 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - ROCK HAS NOT BEEN ADDED TO TRACK OUT AT GATE. |
| 01/29/2016 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT ADDING ROCK AT GATE. |
| 01/28/2016 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - REPAIRS HAVE BEEN DONE. |
| 01/19/2016 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT REPAIRS TO SWPPP CONTROLS. |
| 01/13/2016 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 01/08/2016 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 12/29/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 12/22/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME. |
| 12/15/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE . DO TO RAIN. |
| 12/14/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - STILL WORKING ON SWPPP COTROLS. |
| 12/11/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON REPAIRING SWPPP CONTROLS. |
| 11/24/2015 | SITE - Stormwater Follow-up | RLEDONN1 | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. STILL MOVING DIRT. |
| 11/12/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - TRACK OUT ON CRAYCROFT. NO WASHOUT FOR CONCRETE. NEED TO CLEAN AND ADD TRACKOUT ROCK AND REPAIR SWPPP CONTROLS. |
| 11/04/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 10/30/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
| 10/28/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS ON TRACK OUT. |
| 10/27/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - STREET SWEEPER ON SITE. |
| 10/26/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE GOT WITH GC REP TO REPAIR CONTROLS . |
| 10/23/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - GRADING ACTIVITY ONLY. |
| 10/20/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - STREET SWEEPER WORKING FROM 10 AM TO 2PM. |
| 10/19/2015 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT TRACK OUT ON TO CRAY CROFT AND SWPPP REP FOR GC THEY SAID THAT THE ROAD WOULD BE CLEANED WHEN TRUCKS ARE RUNNING. |