Permit: DP15-0062
Permit Details
Apply Date:
04/09/2015
Applicant:
Description:
DEV PACKAGE
Permit Reviews
Permit Number - DP15-0062
Permit Status: Complete
Permit Description: DEV PACKAGE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/09/2015 | DEV PKG - OK TO SUBMIT | 04/09/2015 | COMPLETED |
| 04/14/2015 | DEV PKG | 07/10/2015 | COMPLETED |
| 07/10/2015 | DEV PKG - RESUBMITTAL | 09/03/2015 | COMPLETED |
| 09/03/2015 | DEV PKG - RESUBMITTAL | 10/05/2015 | COMPLETED |
| 10/05/2015 | DEV PKG - RESUBMITTAL | 02/09/2016 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP15-0062
Permite Description: DEV PACKAGE
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
| 10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: DP15-0062
Permit Description: DEV PACKAGE
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/22/2015 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 12/22/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - MET WITH GC AND WALKED SITE.} | |
| 12/28/2015 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 12/28/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 03/23/2021 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 03/23/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/06/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THESE INSPECTIONS ARE NOT READY AT THIS TIME. PROVIDE ALL CL.OSEOUT DOCUMENTATION PRIOR TO SCHEDULING THESE INSPECTIONS.(APPROVED REVISED DRAWINGS/AS-BUILTS, ENGINEER OF RECORD CERTIFICATION LETTER, N.O.T FOR THE STORMWATER PERMIT.)} | |
| 03/23/2021 | COT - RSBU - Stem Wall/Retaining Wall | Passed | {Activity date: 03/23/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - PERMIT WORK BY OTHER PERMIT} ; {Activity date: 03/06/2019; Status: Not Applicable; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS PERMIT/WALL IS TO BE DONE BY A SEPERATE PERMIT, NOT UNDER THE CURRENT DP15-0062} | |
| 03/23/2021 | SITE - Stormwater Follow-up | Passed | {Activity date: 03/23/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/06/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THESE INSPECTIONS ARE NOT READY AT THIS TIME. PROVIDE ALL CL.OSEOUT DOCUMENTATION PRIOR TO SCHEDULING THESE INSPECTIONS.(APPROVED REVISED DRAWINGS/AS-BUILTS, ENGINEER OF RECORD CERTIFICATION LETTER, N.O.T FOR THE STORMWATER PERMIT.)} | |
| 03/23/2021 | ENGR Grading Final | Passed | {Activity date: 03/23/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/06/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THESE INSPECTIONS ARE NOT READY AT THIS TIME. PROVIDE ALL CL.OSEOUT DOCUMENTATION PRIOR TO SCHEDULING THESE INSPECTIONS.(APPROVED REVISED DRAWINGS/AS-BUILTS, ENGINEER OF RECORD CERTIFICATION LETTER, N.O.T FOR THE STORMWATER PERMIT.)} | |
| 04/04/2024 | ENGR Engineering Final | Passed | ||
| 04/04/2024 | SITE - Stormwater Final Inspection | Passed |