Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 01/08/2021 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by VLEON1 - PARTIAL, APPEARS TO HAVE BEEN CONSTRUCTED PER THE APPROVED PLANS. SITE WAS NOT CHECKED FOR ADA AT THIS TIME BUT WILL BE RESCHEDULED FOR NEXT WEEK. |
| 03/06/2019 |
ENGR Engineering Final
|
DROBERTS |
Not ready for Inspection |
Entered by DROBERT5 - THESE INSPECTIONS ARE NOT READY AT THIS TIME. PROVIDE ALL CL.OSEOUT DOCUMENTATION PRIOR TO SCHEDULING THESE INSPECTIONS.(APPROVED REVISED DRAWINGS/AS-BUILTS, ENGINEER OF RECORD CERTIFICATION LETTER, N.O.T FOR THE STORMWATER PERMIT.) |
| 10/01/2015 |
ENGR Engineering Final
|
eleibol1 |
Prior to Final Inspectn |
Entered by ELEIBOL1 - As-builts with certification statement from EOR for project, and certification from geotechnical engineer for southeast slope/ret wall system, shall be submitted prior to approval of final grading. |
| 03/23/2021 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 03/06/2019 |
ENGR Engineering Final
|
DROBERTS |
Not ready for Inspection |
Entered by DROBERT5 - THESE INSPECTIONS ARE NOT READY AT THIS TIME. PROVIDE ALL CL.OSEOUT DOCUMENTATION PRIOR TO SCHEDULING THESE INSPECTIONS.(APPROVED REVISED DRAWINGS/AS-BUILTS, ENGINEER OF RECORD CERTIFICATION LETTER, N.O.T FOR THE STORMWATER PERMIT.) |
| 04/04/2024 |
ENGR Engineering Final
|
|
Passed |
|