Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP15-0055
Permit Details
Status:
Complete
Type:
Development Package
Address:
3016 N TYNDALL AV
Address NEW:
3016 N TYNDALL AV
Apply Date:
03/31/2015
Applicant:
Lisa Bowers
Description:
TENTATIVE PLAT/FLD - PARK MODERN, LOTS 1-37
Permit Reviews
Permit Number - DP15-0055
Permit Status: Complete
Permit Description: TENTATIVE PLAT/FLD - PARK MODERN, LOTS 1-37
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/05/2016 | DEV PKG - REVISION | 06/19/2017 | COMPLETED |
| 03/31/2015 | DEV PKG - OK TO SUBMIT | 03/31/2015 | COMPLETED |
| 04/06/2015 | TENTATIVE PLAT REVIEW | 05/21/2015 | COMPLETED |
| 05/21/2015 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 07/16/2015 | COMPLETED |
| 07/16/2015 | RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW | 10/28/2015 | COMPLETED |
| 10/28/2015 | REVISION - TENT PLAT & CORE RESUB | 10/29/2015 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP15-0055
Permit Description: TENTATIVE PLAT/FLD - PARK MODERN, LOTS 1-37
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2015 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 11/06/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PRIOR TO GRUBBING AND GRADING OF SITE, INSTALL SEDIMENT CONTROLS PER YOUR SWPPP POST A COPY OF YOUR NOI 2) CALL FOR INSPECTION WHEN CONTROLS HAVE BEEN INSTALLED 3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE 4) SWEEP UP TRACKING AS NEEDED } |
|
| 03/09/2016 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 03/09/2016; Status: Approved; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - } | |
| 05/03/2017 | SITE - Stormwater Follow-up | Passed | {Activity date: 05/03/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 01/25/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/09/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/06/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) RE-BAR LAY OUT FOR TRASH ENCLOSURES INSTALLED PER PLAN, FOOTINGS OK - OK TO POUR CONCRETE 2) SITE IS NON-COMPLIANT WITH THE SWPPP AND STORM WATER PERMIT. RE-ESTABLISH SEDIMENT CONTROLS, POST A COPY OF YOUR NOI AND FOLLOW YOUR SWPPP.} ; {Activity date: 05/05/2016; Status: Continued; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) CALLED FOR INSPECTION OF RE-BAR LAY OUT FOR TRASH ENCLOSURES, NOT READY FOR INSPECTION 2) ENSURE SITE IS IN COMPLIANCE WITH YOUR SWPPP AND STORM WATER PERMIT} ; {Activity date: 03/09/2016; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by MRUSSO1 - 1) SEDIMENT CONTROLS NEED MAINTAINED THROUGHOUT CONSTRUCTION 2) PROVIDE VERIFICATION OF STORM WATER SELF INSPECTIONS 3) SWEEP UP TRACKED SOIL OFF TYNDAL ROAD} |
|
| 05/03/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 05/03/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE IS STABILIZED, FILE A NOTICE OF TERMINATION WITH ADEQ} | |
| 06/20/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 06/20/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
| 06/20/2017 | ENGR Engineering Final | Passed | {Activity date: 06/20/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/10/2017; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - WALKED SITE WITH THE ENG OF RECORD} | |
| 06/20/2017 | ENGR Grading Final | Passed | {Activity date: 06/20/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } |