Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 05/03/2017 |
SITE - Stormwater Follow-up
|
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 01/25/2017 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 06/09/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 05/06/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by MRUSSO1 - 1) RE-BAR LAY OUT FOR TRASH ENCLOSURES INSTALLED PER PLAN, FOOTINGS OK - OK TO POUR CONCRETE
2) SITE IS NON-COMPLIANT WITH THE SWPPP AND STORM WATER PERMIT. RE-ESTABLISH SEDIMENT CONTROLS, POST A COPY OF YOUR NOI AND FOLLOW YOUR SWPPP. |
| 05/05/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by MRUSSO1 - 1) CALLED FOR INSPECTION OF RE-BAR LAY OUT FOR TRASH ENCLOSURES, NOT READY FOR INSPECTION
2) ENSURE SITE IS IN COMPLIANCE WITH YOUR SWPPP AND STORM WATER PERMIT |
| 03/09/2016 |
SITE - Stormwater Follow-up
|
MRUSSO |
Correction Required |
Entered by MRUSSO1 - 1) SEDIMENT CONTROLS NEED MAINTAINED THROUGHOUT CONSTRUCTION
2) PROVIDE VERIFICATION OF STORM WATER SELF INSPECTIONS
3) SWEEP UP TRACKED SOIL OFF TYNDAL ROAD |