Permit: DP15-0044
Permit Details
Apply Date:
03/13/2015
Applicant:
Lisa Bowers
Description:
DP/SITE/GRADING - STONE AVE HOMESOriginally approved 12/7/20151st revision approved 1/26/2016
Completed Inspections
Permit Status: Complete
Permit Number: DP15-0044
Permit Description: DP/SITE/GRADING - STONE AVE HOMESOriginally approved 12/7/20151st revision approved 1/26/2016
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2016 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 03/21/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
| 04/26/2017 | SITE - Stormwater Follow-up | Passed | {Activity date: 04/26/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - } ; {Activity date: 04/26/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - } ; {Activity date: 04/26/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - } ; {Activity date: 12/22/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT REPAIRING SWPPP.} ; {Activity date: 07/08/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC ABOUT SWPPP REPAIR.} | |
| 04/26/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 04/26/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - } | |
| 04/26/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 04/26/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - } ; {Activity date: 04/26/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - } ; {Activity date: 04/26/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DROBERT5 - } | |
| 05/11/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 05/11/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/28/2017; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE VISIT TO VERIFY WHAT IS NEEDED FOR FUTURE COMBO PERMITS THAT WILL BE INSPECTED ON 3/29/17} | |
| 05/11/2017 | RSBU - Building Final | Passed | {Activity date: 05/11/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 05/11/2017 | ENGR Engineering Final | Passed | {Activity date: 05/11/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/30/2017; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE IS NOT READY AT THIS TIME, THEY WILL BE LOOKING FOR TCO ON SOME OF THE BUILDING ON 3/29/17 FOR UNITS #3 - #6} | |
| 05/11/2017 | ENGR Grading Final | Passed | {Activity date: 05/11/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |