Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/26/2017 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by DROBERT5 - |
| 04/26/2017 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by DROBERT5 - |
| 03/28/2017 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - SITE VISIT TO VERIFY WHAT IS NEEDED FOR FUTURE COMBO PERMITS THAT WILL BE INSPECTED ON 3/29/17 |
| 02/01/2017 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC ABOUT PROVIDING REVIONS FOR ALL CHANGES TO COT AP PLANS. AND REPAIRING WPPP CONTROLS. |
| 11/23/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITHGC ON SITE ABOUT STEPS AT EACH UNIT. AND NOTES ON AP PLANS SAY MAKE UNITS ACCESSIBLE. |
| 06/22/2016 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by RLEDONN1 - MET WITH GC ABOUT ROOF DRAINS GOING OVER SIDE WALKS |
| 04/26/2017 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by DROBERT5 - |
| 04/26/2017 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by DROBERT5 - |
| 04/26/2017 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by DROBERT5 - |
| 05/11/2017 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |