Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
5301 E GRANT RD
Apply Date:
02/17/2015
Applicant:
Description:
SITE/GRADING/SWPPP - TMC WOMAN'S CENTER ADDITION

Permit Reviews

Permit Number - DP15-0023
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - TMC WOMAN'S CENTER ADDITION
Start Date Submittal Complete Date Status  
01/09/2017 REVISION - SITE 01/09/2017 COMPLETED Review Details
01/20/2017 REVISION - SITE 01/20/2017 ACTIVE Review Details
02/17/2015 DEV PKG - OK TO SUBMIT 02/17/2015 COMPLETED Review Details
02/17/2015 SITE and/or GRADING 03/20/2015 COMPLETED Review Details
04/07/2015 RESUB - SITE/GRADING ALL 05/04/2015 COMPLETED Review Details
05/05/2015 RESUB - SITE and/or GRADING 06/15/2015 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP15-0023
Permite Description: SITE/GRADING/SWPPP - TMC WOMAN'S CENTER ADDITION
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/20/2017 ENGR Engineering Final N/A Not Ready {Activity date: 01/20/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by LBOJORQ1 - } ; {Activity date: 01/20/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE COT AP AS-BUILTS. PROVIDE NOI FOR SWPPP.} ; {Activity date: 01/09/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET NOTES FROM 1/4/2017} ; {Activity date: 01/04/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE AP PLANS ON SITE .PROVIDE AS-BUILTS AND CERT LETTER FOR ALL CHANGES TO AP PLANS. COMPLET BIKE PARKING . CURB RAMP ON SOTH EAST SIDE OF BUILDING THE LANDING IS OVER 2%. LIST MAY NOT BE COMPLET.} ; {Activity date: 12/05/2016; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE STILL NEED ATO BE COMPLETED AS SHOWN ON THE APPROVED PLANS PRIOR TO SCHEDULING THIS INSPECTION. ALSO PROVIDE THE REVISED PLANS FOR THE FINAL INSPECTION ALONG WITH THE CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR THIS SITE.} ; {Activity date: 11/05/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PASE#1 INSTALL ADA SIGN PER AP PLANS PROVUDE AS-BUILTS FOR ALL CHANGES TO AP PLANS BY .}

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0023
Permit Description: SITE/GRADING/SWPPP - TMC WOMAN'S CENTER ADDITION
Total Completed Inspections - 6
Date Description Inspector Results Comments
08/21/2015 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 08/21/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC AND OWERS REP AT PRE-CON MEETING .}
11/18/2016 SITE - Stormwater Follow-up Passed {Activity date: 11/18/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 10/05/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/08/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/14/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 06/17/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/17/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - INSPECTION PER C4.1 HIGH LIGHTS.} ; {Activity date: 12/14/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - INSPECTION PER C4.1 HIGH LIGHTS.} ; {Activity date: 12/07/2015; Status: Continued; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - INSTALLED PER HIGH LIGHTS ON PAGE C4.1.} ; {Activity date: 12/04/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - STORMWATER PER HIGH LIGHTS ON C4.1} ; {Activity date: 12/04/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 11/20/2015; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 09/23/2015; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, THE CREWS HAVE BEEN ADVISED TO KEEP THE EQUIPMENT OFF OF THE PAVEMENT TILL THE SITE IS DRY.} ; {Activity date: 09/22/2015; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO ONE ON SITE TODAY.} ; {Activity date: 09/21/2015; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, IT IS RAINING AND THE SITE IS SHUT DOWN FOR THE DAY.}
11/18/2016 SITE - Stormwater Final Inspection Passed {Activity date: 11/18/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
11/18/2016 SITE - Stormwater Setup and Controls Passed {Activity date: 11/18/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }
01/04/2017 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 12/02/2016; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - LANDSCAPE MATERIAL BEING INSTALLED AT THIS TIME, FINAL NOT TO BE GIVEN TILL ALL THE WORK IS COMPLETED AS SHOWN ON THE APPROVED PLANS.}
01/04/2017 ENGR Grading Final Passed {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 02/03/2016; Status: Continued; Inspector: eleibol1; Comment: Entered by ELEIBOL1 - Prelim dr stmt and details of pipe for existing stormdrain connection was discussed with EOR and RA. Draiange Report Addendum will be submitted in a few days. Concept was acceptable although not ideal. Hospital will be required to provide extra maintenance activities to pump out standing water in pipe system from Type4CB periodically after monsoon storm events and after other large storms since standing water may be up to 1-ft deep.} ; {Activity date: 11/05/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }

Documents

File Name Document Type  
001_COVER SHEET_C0.1.TIF DEVELOPMENT PACKAGE VIEW
002_GENERAL NOTES_C0.2.TIF DEVELOPMENT PACKAGE VIEW
003_GENERAL NOTES_C0.3.TIF DEVELOPMENT PACKAGE VIEW
004_PAD SITE DATA_C0.4.TIF DEVELOPMENT PACKAGE VIEW
005_PARKING KEY MAP_C0.5.TIF DEVELOPMENT PACKAGE VIEW
006_SITE_C1.1.TIF DEVELOPMENT PACKAGE VIEW
007_SITE_C1.2.TIF DEVELOPMENT PACKAGE VIEW
008_GRADING / PAVING_C2.1.TIF DEVELOPMENT PACKAGE VIEW
009_GRADING / PAVING_C2.2.TIF DEVELOPMENT PACKAGE VIEW
010_HORIZONTAL CONTROL_C3.1.TIF DEVELOPMENT PACKAGE VIEW
011_HORIZONTAL CONTROL_C3.2.TIF DEVELOPMENT PACKAGE VIEW
012_STORM DRAIN / UTILITY_C4.1.TIF DEVELOPMENT PACKAGE VIEW
013_STORM DRAIN / UTILITY_C4.2.TIF DEVELOPMENT PACKAGE VIEW
014_DEMOLITION_C5.1.TIF DEVELOPMENT PACKAGE VIEW
015_DEMOLITION_C5.2.TIF DEVELOPMENT PACKAGE VIEW
016_SIGNING / STRIPING_C6.1.TIF DEVELOPMENT PACKAGE VIEW
017_SIGNING / STRIPING_C6.2.TIF DEVELOPMENT PACKAGE VIEW
018_STORM WATER MANAGEMENT_C7.1.TIF DEVELOPMENT PACKAGE VIEW
019_STORM WATER MANAGEMENT_C7.2.TIF DEVELOPMENT PACKAGE VIEW
020_FIRE ACCESS / FIRE HYDRANT LOCATIONS_C8.1.TIF DEVELOPMENT PACKAGE VIEW
021_SECTIONS / DETAILS_C8.2.TIF DEVELOPMENT PACKAGE VIEW
022_SECTIONS / DETAILS_C8.3.TIF DEVELOPMENT PACKAGE VIEW
023_NOTES_L0.1.TIF DEVELOPMENT PACKAGE VIEW
024_NPPP_L1.1.TIF DEVELOPMENT PACKAGE VIEW
025_NPPP_L1.2.TIF DEVELOPMENT PACKAGE VIEW
026_LANDSCAPE_L2.1.TIF DEVELOPMENT PACKAGE VIEW
027_LANDSCAPE_L2.2.TIF DEVELOPMENT PACKAGE VIEW
028_IRRIGATION_L3.1.TIF DEVELOPMENT PACKAGE VIEW
029_IRRIGATION_L3.2.TIF DEVELOPMENT PACKAGE VIEW
030_LANDSCAPE DETAILS_L4.1.TIF DEVELOPMENT PACKAGE VIEW
031_IRRIGATION DETAILS_L4.2.TIF DEVELOPMENT PACKAGE VIEW
005_PAVING CONSTRUCTION NOTES.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW