Permit: DP15-0023
Permit Details
Apply Date:
02/17/2015
Applicant:
Description:
SITE/GRADING/SWPPP - TMC WOMAN'S CENTER ADDITION
Permit Reviews
Permit Number - DP15-0023
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - TMC WOMAN'S CENTER ADDITION
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/09/2017 | REVISION - SITE | 01/09/2017 | COMPLETED |
01/20/2017 | REVISION - SITE | 01/20/2017 | ACTIVE |
02/17/2015 | DEV PKG - OK TO SUBMIT | 02/17/2015 | COMPLETED |
02/17/2015 | SITE and/or GRADING | 03/20/2015 | COMPLETED |
04/07/2015 | RESUB - SITE/GRADING ALL | 05/04/2015 | COMPLETED |
05/05/2015 | RESUB - SITE and/or GRADING | 06/15/2015 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP15-0023
Permite Description: SITE/GRADING/SWPPP - TMC WOMAN'S CENTER ADDITION
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/20/2017 | ENGR Engineering Final | N/A | Not Ready | {Activity date: 01/20/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by LBOJORQ1 - } ; {Activity date: 01/20/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE COT AP AS-BUILTS. PROVIDE NOI FOR SWPPP.} ; {Activity date: 01/09/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET NOTES FROM 1/4/2017} ; {Activity date: 01/04/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PROVIDE AP PLANS ON SITE .PROVIDE AS-BUILTS AND CERT LETTER FOR ALL CHANGES TO AP PLANS. COMPLET BIKE PARKING . CURB RAMP ON SOTH EAST SIDE OF BUILDING THE LANDING IS OVER 2%. LIST MAY NOT BE COMPLET.} ; {Activity date: 12/05/2016; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - SITE STILL NEED ATO BE COMPLETED AS SHOWN ON THE APPROVED PLANS PRIOR TO SCHEDULING THIS INSPECTION. ALSO PROVIDE THE REVISED PLANS FOR THE FINAL INSPECTION ALONG WITH THE CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR THIS SITE.} ; {Activity date: 11/05/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - PASE#1 INSTALL ADA SIGN PER AP PLANS PROVUDE AS-BUILTS FOR ALL CHANGES TO AP PLANS BY .} |
Completed Inspections
Permit Status: Complete
Permit Number: DP15-0023
Permit Description: SITE/GRADING/SWPPP - TMC WOMAN'S CENTER ADDITION
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/21/2015 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/21/2015; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH GC AND OWERS REP AT PRE-CON MEETING .} | |
11/18/2016 | SITE - Stormwater Follow-up | Passed | {Activity date: 11/18/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 10/05/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 08/08/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/14/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 06/17/2016; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.} ; {Activity date: 12/17/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - INSPECTION PER C4.1 HIGH LIGHTS.} ; {Activity date: 12/14/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - INSPECTION PER C4.1 HIGH LIGHTS.} ; {Activity date: 12/07/2015; Status: Continued; Inspector: RLEDONN1; Comment: Entered by RLEDONN1 - INSTALLED PER HIGH LIGHTS ON PAGE C4.1.} ; {Activity date: 12/04/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - STORMWATER PER HIGH LIGHTS ON C4.1} ; {Activity date: 12/04/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 11/20/2015; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME.} ; {Activity date: 09/23/2015; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, THE CREWS HAVE BEEN ADVISED TO KEEP THE EQUIPMENT OFF OF THE PAVEMENT TILL THE SITE IS DRY.} ; {Activity date: 09/22/2015; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO ONE ON SITE TODAY.} ; {Activity date: 09/21/2015; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, IT IS RAINING AND THE SITE IS SHUT DOWN FOR THE DAY.} | |
11/18/2016 | SITE - Stormwater Final Inspection | Passed | {Activity date: 11/18/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
11/18/2016 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 11/18/2016; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
01/04/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 12/02/2016; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - LANDSCAPE MATERIAL BEING INSTALLED AT THIS TIME, FINAL NOT TO BE GIVEN TILL ALL THE WORK IS COMPLETED AS SHOWN ON THE APPROVED PLANS.} | |
01/04/2017 | ENGR Grading Final | Passed | {Activity date: 01/04/2017; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 02/03/2016; Status: Continued; Inspector: eleibol1; Comment: Entered by ELEIBOL1 - Prelim dr stmt and details of pipe for existing stormdrain connection was discussed with EOR and RA. Draiange Report Addendum will be submitted in a few days. Concept was acceptable although not ideal. Hospital will be required to provide extra maintenance activities to pump out standing water in pipe system from Type4CB periodically after monsoon storm events and after other large storms since standing water may be up to 1-ft deep.} ; {Activity date: 11/05/2015; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } |