Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP15-0023
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/20/2017 | ENGR Engineering Final | DROBERTS | Approved | Entered by LBOJORQ1 - |
01/20/2017 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - PROVIDE COT AP AS-BUILTS. PROVIDE NOI FOR SWPPP. |
01/09/2017 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - COMPLET NOTES FROM 1/4/2017 |
01/04/2017 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - PROVIDE AP PLANS ON SITE .PROVIDE AS-BUILTS AND CERT LETTER FOR ALL CHANGES TO AP PLANS. COMPLET BIKE PARKING . CURB RAMP ON SOTH EAST SIDE OF BUILDING THE LANDING IS OVER 2%. LIST MAY NOT BE COMPLET. |
12/05/2016 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by DROBERT5 - SITE STILL NEED ATO BE COMPLETED AS SHOWN ON THE APPROVED PLANS PRIOR TO SCHEDULING THIS INSPECTION. ALSO PROVIDE THE REVISED PLANS FOR THE FINAL INSPECTION ALONG WITH THE CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR THIS SITE. |
11/05/2015 | ENGR Engineering Final | RLEDONNE | Continued | Entered by RLEDONN1 - PASE#1 INSTALL ADA SIGN PER AP PLANS PROVUDE AS-BUILTS FOR ALL CHANGES TO AP PLANS BY . |