Permit: DP15-0006
Permit Details
Apply Date:
01/16/2015
Applicant:
Description:
SITE/GRADING: RAISING CANE'S RESTAURANT
Permit Reviews
Permit Number - DP15-0006
Permit Status: Complete
Permit Description: SITE/GRADING: RAISING CANE'S RESTAURANT
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/16/2015 | DEV PKG - OK TO SUBMIT | 01/16/2015 | COMPLETED |
01/16/2015 | SITE and/or GRADING | 02/12/2015 | COMPLETED |
03/05/2015 | SITE and/or GRADING | 03/05/2015 | COMPLETED |
03/05/2015 | RESUB - SITE and/or GRADING | 03/31/2015 | COMPLETED |
03/31/2015 | RESUB - SITE and/or GRADING | 06/09/2015 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP15-0006
Permit Description: SITE/GRADING: RAISING CANE'S RESTAURANT
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/12/2015 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 06/12/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS <1AC THEREFORE, NO STORM WATER PERMIT IS REQUIRED. HOWEVER CONTRACTOR MUST KEEP SOIL ON SITE DURING CONSTRUCTION. 2) CALL FOR INSPECTION FOR ANY SITE/GRADING/LANDSCAPING QUESTIONS AND/OR CONCERNS. 3) RECOMMEND INSTALLATION OF A STABILIZED CONSTRUCTION ENTRANCE. 4) WILL INSPECT THE SITE PER THE APPROVED PLANS.} |
|
10/15/2015 | ENGR Grading Final | Passed | {Activity date: 10/15/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
11/09/2015 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 11/09/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
11/09/2015 | SITE - Stormwater Follow-up | Passed | {Activity date: 11/09/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SUBMIT A NOTICE OF TERMINATION WITH ADEQ} ; {Activity date: 10/15/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MAJORITY OF SITE IS STABILIZED} ; {Activity date: 10/08/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/17/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP 2) SITE IS UNDER A SWPPP UNTIL IT IS 100% STABILIZED 3) SWEEP UP ANY TRACKING OF SOIL OFF SITE 4) MAINTAIN YOUR SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION.} ; {Activity date: 07/13/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SWEEP UP TRACKED SOIL 2) CLEAN UP SPOILS FROM TRENCHING 3) NO OTHER SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/07/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME} |
|
11/16/2015 | ENGR Engineering Final | Passed | {Activity date: 11/16/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 11/09/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECORD. 2) COMPLETE LANDSCAPING AND ALL SITE WORK} ; {Activity date: 10/15/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL: 1) COMPLETE CONSTRUCTION PER THE APPROVED PLANS 2) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD} |
|
07/01/2017 | RSBU - Building Final | Passed | {Activity date: 07/01/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |