Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 11/09/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Approved |
Entered by DROBERT5 - SUBMIT A NOTICE OF TERMINATION WITH ADEQ |
| 10/15/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Approved |
Entered by DROBERT5 - MAJORITY OF SITE IS STABILIZED |
| 10/08/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 09/17/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP
2) SITE IS UNDER A SWPPP UNTIL IT IS 100% STABILIZED
3) SWEEP UP ANY TRACKING OF SOIL OFF SITE
4) MAINTAIN YOUR SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION. |
| 07/13/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) SWEEP UP TRACKED SOIL
2) CLEAN UP SPOILS FROM TRENCHING
3) NO OTHER SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 07/07/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME |