Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
5130 N GRACIOUS CT
Apply Date:
12/11/2014
Applicant:
Description:
GRADING ONLY

Permit Reviews

Permit Number - DP14-0233
Permit Status: Complete
Permit Description: GRADING ONLY
Start Date Submittal Complete Date Status  
06/25/2015 REVISION - GRADING 08/12/2015 COMPLETED Review Details
12/11/2014 GRADING 06/25/2015 COMPLETED Review Details

Conditions

Permit Number - DP14-0233
Permit Status: Complete
Permit Description: GRADING ONLY
Date Description Comments
12/11/2014 The following 10 conditions apply to grading permit for lot 12 (DP14-0233):1)There shall be no disturbance, and that materials and / or construction equipment may not be stockpiled or parked, outside of approved grading limits at any time. 2)All grading construction work shall conform to IBC Chapter 18, City of Tucson DS Sec.11-01, and Hillside Development Zone requirements.3)This lot is located in SCZ so 3:1(H:V) slopes is the max slope grade allowed. Any small areas of rip rapped slope shall have handplaced stone with filter fabric per HDZ requirements, unless required to have handplaced grouted rip rap or other slope protection as per geotechnical engineering report or addenda. 4)Any future wall openings shall be provided for surface drainage from yard or patio areas. 5)If grading construction is expected to last longer than the expiration date of the grading permit, contact City of Tucson Development Services Department to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.6)Call for PDSD Engineering Pre-construction meeting and other Inspections. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Planning & Development Services Department, or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 7)Any revision to the Grading Plan may require a re-submittal of a revised grading plan for review. Contact PDSD Engineering at 791-5550 to discuss changes in grading design.8)If grading construction is expected to last longer than the expiration date of the grading permit, contact PDSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required. 9)The permitee shall notify the PDSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all erosion control measures have been completed in accordance with the approved grading plan and grading permit. 10)Any remaining assurable items shall be completed prior to release of this CofO, including, if required, handplaced rip rap with filter fabric in public slope easement within lot boundary.

Completed Inspections

Permit Status: Complete
Permit Number: DP14-0233
Permit Description: GRADING ONLY
Total Completed Inspections - 7
Date Description Inspector Results Comments
02/05/2015 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/05/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER PLAN, PER SITE SPECIFICS AND PER INSPECTION RECOMMENDATIONS.
2) NO NPPO REQUIREMENTS FOR LOT
3) MAY NEED TO MARK GRADING LIMIT TO PREVENT ENCROACHMENT INTO NATURAL OPEN SPACE AREA
4) CALL FOR INSPECTION ONCE CONTROLS ARE IN PLACE}
06/25/2015 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 06/25/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/12/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS} ; {Activity date: 02/05/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO NPPO REQUIREMENTS PER PLAN}
06/25/2015 ENGR Engineering Final Passed {Activity date: 06/25/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
06/25/2015 SITE - Stormwater Follow-up Passed {Activity date: 06/25/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 05/15/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/06/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 04/16/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SGINIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/16/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by ARUIZ1 - 1. SWEEP UP TANKED SOIL PFF ADJACENT ROADWAY
2. ENSURE YOU PERFORM STORM WATER SELF INSPECTION AND DOCMENT THEM
3. CLEAN UP AND DISPOSE OF CONCRETE/MATERIALS WASH OUT
4. MAINTAIN SEDIMENT CONTROL THROUGHT CONSTRUCTION} ; {Activity date: 04/07/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
2) SWEEP UP TRACKED SOIL AS NEEDED} ; {Activity date: 03/09/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/26/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 02/12/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME}
06/25/2015 ENGR Grading Final Passed {Activity date: 06/25/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 05/06/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 04/22/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 02/26/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CALL FOR INSPECTION FOR ANY CHANGES FROM THE ORIGINAL PLAN.}
06/25/2015 SITE - Stormwater Final Inspection Passed {Activity date: 06/25/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
06/25/2015 SITE - Stormwater Setup and Controls Passed {Activity date: 06/25/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_SHEET 1 OF 2.TIF DEVELOPMENT PACKAGE VIEW
002_SHEET 2 OF 2.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW