Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 06/25/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 05/15/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 05/06/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME |
| 04/16/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SGINIFICANT STORM WATER CONCERNS AT THIS TIME |
| 03/16/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by ARUIZ1 - 1. SWEEP UP TANKED SOIL PFF ADJACENT ROADWAY
2. ENSURE YOU PERFORM STORM WATER SELF INSPECTION AND DOCMENT THEM
3. CLEAN UP AND DISPOSE OF CONCRETE/MATERIALS WASH OUT
4. MAINTAIN SEDIMENT CONTROL THROUGHT CONSTRUCTION |
| 04/07/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
2) SWEEP UP TRACKED SOIL AS NEEDED |
| 03/09/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 02/26/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO STORM WATER COCNERNS AT THIS TIME |
| 02/12/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME |