Permit: DP14-0218
Permit Details
Apply Date:
11/25/2014
Applicant:
Lisa Bowers
Description:
DP- SITE/GRADING - STURGEON ELECTRIC
Permit Reviews
Permit Number - DP14-0218
Permit Status: Complete
Permit Description: DP- SITE/GRADING - STURGEON ELECTRIC
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/20/2015 | RESUB - SITE and/or GRADING | 09/10/2015 | COMPLETED |
| 09/10/2015 | RESUB - SITE and/or GRADING | 09/14/2015 | COMPLETED |
| 09/14/2015 | DEV PKG - RESUBMITTAL | 11/03/2015 | COMPLETED |
| 11/25/2014 | DEV PKG - OK TO SUBMIT | 11/25/2014 | COMPLETED |
| 11/25/2014 | SITE and/or GRADING | 01/20/2015 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP14-0218
Permit Description: DP- SITE/GRADING - STURGEON ELECTRIC
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/28/2017 | SITE - Stormwater Follow-up | Passed | {Activity date: 03/28/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 03/28/2017 | ENGR Grading Final | Passed | {Activity date: 03/28/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 03/28/2017 | SITE - Stormwater Final Inspection | Passed | {Activity date: 03/28/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 03/28/2017 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 03/28/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 03/28/2017 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 03/28/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 04/11/2017 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 04/11/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/28/2017; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT5 - INSTALL ALL OF THE REQUIRED LANDSCAPING ITEMS THAT ARE HIGHLIGHTED ON SHEET #7 OF 7 PRIOR TO RESCHEDULING THIS FOR ANOTHER FINAL INSPECTION.} | |
| 04/11/2017 | ENGR Engineering Final | Passed | {Activity date: 04/11/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/28/2017; Status: Denied; Inspector: DROBERTS; Comment: Entered by DROBERT5 - 1) INSTALL ALL OF THE REQUIRED LANDSCAPING ITEMS THAT ARE HIGHLIGHTED ON SHEET #7 OF 7 PRIOR TO RESCHEDULING THIS FOR ANOTHER FINAL INSPECTION. 2)ALSO INSTALL THE REMAINING SIDEWALK THAT HAS NOT BEEN POURED ALONG THE WEST SIDE OF THE EXISTING BUILDING. 3) PROVIDE REVISED DRAWINGS FROM THE ENGINEER OF RECORD PLUS A CERTIFICATION LETTER FOR THIS SITE WHEN YOU SCHEDULE THE FINAL INSPECTIONS.} |